Future medical office building - views methodology
CS-v4.1 EQc5:Quality Viewsposted by Jeremy Shiman on
We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB.
PCR for Pavement Preservation
NC-v4.1 MRc2:Environmental Product Declarationsposted by Mike March on
I’m working on generating an LCA and EPD for a product I develop and am running into an unexpected hurdle - finding a PCR and Program Operator.
CO Sensors for every Residential Unit as per Minimum IAQ Performance
NC-v4 EQp1:Minimum indoor air quality performanceposted by Alokmay Behera on
In one of our Projects with residential spaces, we are required to provided CO sensors for every residential unit. This is a mandatory requirement under the pre-requisite.
How do I calculate the total runoff, if I am required to send rainwater elsewhere?
EBOM-v4.1 SSc1:Rainwater Managementposted by Rick Fox on
I have so many questions concerning storm water management. My company is a large warehouse. We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 sq
More elaboration on the long-term storage
CI-v4.1 LTc4:Bicycle Facilitiesposted by CRB Sustainability on
We are currently certifying under CI 4.1, and I would like to gain a deeper understanding of the requirements for long-term storage of bikes located outside of the building.
Averaging Facility Rates over Time
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick on
The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility.
LEED GA / LEED AP Study Resources
posted by Allison Wilson on
I'm sure if I hop in the way back machine I could look in the forums and find old threads on LEED GA and LEED AP study resources, but I also know that material comes in and out of date.
Option 2: Emergency Preparedness Planning Red Cross Form Examples
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Julia Manion on
Does anyone have an example of the American Ready Cross 123 Assessment and Facility Description Forms to preview before attempting this credit???
OPR & BOD & Design Document review
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dave Hubka on
Fundamental Commissioning requires the CxA to review the OPR and BOD and design documents.