Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Conformity of commingled facility process

NC-v4 MRc5:Construction and demolition waste management
posted by  William Leblanc  on 

The commingled waste facility that process our project waste work as follows: They weight the container once it arrives from job site, then separate the diffents matrials into percentage of the loa

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Mon May 8, 2017, 5:27 pm

IAQ calculator v03

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

4
Mon May 8, 2017, 7:51 am

IAQ calculator v03

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

4
Default Avatar
LEED AP, BREEAM Assessor, WELL AP, Fitwel Ambassador |Associate Director
Colliers International Poland
LEEDuser Basic Member
4 thumbs up
Mon May 8, 2017, 7:43 am

Galvanize Repair

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Sean Kirk  on 

Hello, My project contains interior galvanized steel which will need repairing during installation.

3
Green Building Project Manager
visio | architects and consultants
LEEDuser Basic Member
9 thumbs up
Sun May 7, 2017, 4:04 pm

light density in wellness center

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

What space type shall be considered for a wellness center (e.g.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri May 5, 2017, 9:58 pm

Zone Air Distribution Effectiveness

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

In the office the air (cold in summer, warm in winter) is both wall supplied and ceiling supplied. The air is exhausted from the WCs.

2
Fri May 5, 2017, 2:21 pm

Garbage Truck Maintenance Garage

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Even though the vehicles parked inside the garage are garbage trucks and not vehicles used by FTE employees, can I still consider those parking spaces for Option 2?

4
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Fri May 5, 2017, 11:52 am

VOC Content

NC-v4 EQc2:Low emitting materials
posted by  Catherine Blakemore  on 

Hi I am just becoming aquainted with the Low-Emitting Materials Calculator.

4
Thu May 4, 2017, 12:09 am

proposed model fan power

CS-2009 EAp2:Minimum Energy Performance
posted by  jack evans  on 

We have received our Design Final Review comments and the LEED reviewer has denied EAp2 because the proposed equipment capacities do not match the equipment schedules on the HVAC drawings.

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Wed May 3, 2017, 7:42 pm

Design Build Projects

NC-v4 IPc1:Integrative process
posted by  Michelle Rosenberger  on 

Our region primarily uses design build which means that there are two very separate Schematic Design processes for our projects.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 3, 2017, 4:58 pm