I have a CI project with 20 allocated spaces. The overall carpark / site wide parking is over 200 spaces. The requirement is 3% of the "sites" total capacity per NC SSc4.3 for option 2: Fuelling stations. This will equate 1 fuelling station (assuming the allocated tenant spaces are used) or 6 (if the entire site is considered). Am I correct in understanding the requirement is for the tenants allocated spaces and not the entire site? i.e. Install 1 fuelling station and not 6.
Thanks in advance.
Michael Smithing
Director - Green Building AdvisoryColliers International Ltd.
304 thumbs up
March 8, 2015 - 9:10 pm
SSc1 is about the building, so if you want to use NC SSc4.3 to document path 12 then you will need to meet the requirements for the entire building - in this case 6 fueling stations.
If you only have 1 fueling station you can meet the requirements of NC SSc4.3 as they apply to your CI project area - 1 fueling station - as an Innovations credit.
Kristopher Croghan
Workplace Sector LeaderLS3P
3 thumbs up
July 25, 2017 - 11:26 am
Graham - Were you successful in obtaining this credit?