Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline HVAC Modelling - System 8, Electric Resistance Heating, and Heat Recovery (ASHRAE 90.1‑2010 Appendix G)

NC-v4 EAp2:Minimum energy performance
posted by  Anurag Ghosh  on 

Hi All,

We are modelling a commercial tower under ASHRAE 90.1‑2010 Appendix G. The proposed design includes:

1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Nov 14, 2025, 4:13 pm
6
Assistant Sustainability Manager
L&T Construction
LEEDuser Basic Member
2 thumbs up
Fri Nov 14, 2025, 9:34 am

Feedback after pursuing PC132

Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materials
posted by  Dirk Kestner  on 

We are completing our pursuit of this Pilot Credit. Overall it went well. Here are a few comments and observations:

5
Default Avatar
LEEDuser Premium Member
1 thumbs up
Mon Nov 17, 2025, 4:49 pm

LEED BD+C v4.1 Transit

LEED v4.1 Discussion Forum
posted by  Deepika Parmar  on 

We are currently working on a metro project comprising 13 stations (a mix of at-grade, elevated, and underground typologies) and 1 depot, spread across multiple locations within the city.

2
Wed Nov 12, 2025, 3:20 pm

Is pc98 required to earn pc99?

Pilot-Credits IPpc99:Design for Enhanced Resilience
posted by  Elizabeth Powers  on 

Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit mea

6
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Mon Nov 10, 2025, 6:03 pm
3
Thu Nov 6, 2025, 1:51 pm

Pilot Credit Feedback

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Jordan Millet  on 

This pilot credit requires participation in the LEEDuser pilot credit forum.

0

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by     on 

The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.

9
Tue Nov 4, 2025, 4:29 pm

INc1 Bird Collision Deterrence

NC-v4.1 INc1:Innovation
posted by  Sean Smith  on 

Question regarding documenting this innovation credit, the credit requirements highlight the steps for calculating the bird collision rating (BCR), and mention we are to multiply the threat factor

0

Social Equity within the Project Team (Option 1)

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Atlas Turner  on 

Is there a reason why this pilot program for IPpc90 references social equity within the operations and maintenance staff and not social equity within the project team?

6
Tue Nov 4, 2025, 3:50 pm