Checking oh IAQ management plan during construction

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Caroline PIN  on 

Dear all, I read it's necessary to do 3 date & time stamped visits with 6 photo for each visit to submet on LEED Online IEQ credit 3.1. It is true ?

2
Thu Sep 17, 2015, 8:23 am

Do parking garages need to be included in the LEED project?

General forums
posted by  Mark Meaders  on 

We have a project that is being designed, and there is a parking garage being build on the site as well.

6
Thu Sep 17, 2015, 3:26 am

System type

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Emmanuel Pauwels  on 

If a space is ventilated through an exhaust fan (rate according VRP) and a permanently open vent to the outdoors, can this space be considered mechanically ventilated, 100%OA and can use an Ez of 0

5
Wed Sep 16, 2015, 3:11 pm

Compliance paths for estar eligible buildings with scores <75

EBOM-v4 EAp2:Minimum energy performance
posted by  Alexa Stone  on 

We have a building that is an ENERGY STAR-eligible building type but has a score that is less than 75 and unable to achieve 75. Using Case 1 it would not qualify.

3
Default Avatar
ecoPreserve
LEEDuser Basic Member
0 thumbs up
Wed Sep 16, 2015, 3:07 pm

Case 2, Option 2 clarification - years

EBOM-v4 EAp2:Minimum energy performance
posted by  Alexa Stone  on 

The reference guide refers to comparing site energy data for the previous 12 months with data from the 3 contiguous yrs of previous 5 yrs (in order to demo 25% improvement).

3
Default Avatar
ecoPreserve
LEEDuser Basic Member
0 thumbs up
Wed Sep 16, 2015, 2:56 pm

Kitchen MUA Unit

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Laura Charlier  on 

I'm wondering if the kitchen MUA unit needs to included in the ventilation calculations?

2
Wed Sep 16, 2015, 10:24 am

CO2 SENSOR IN AN UNDERGROUND METRO STATION.

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  VEL MUTHU  on 

Hello everyone, I am working in a underground metro station which is aiming for LEED certification.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Sep 15, 2015, 2:37 pm

Interior Lighting power

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus and colleagues, If in the Proposed building the total interior lighting power (space by space method) is bigger than those of the Baseline, is this acceptable.

5
Tue Sep 15, 2015, 1:50 pm

Post construction HVAC modifications

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Paula Hernandez  on 

Hi, We have a building in the construction review response instance. We are responding every comment, but we want to get more points to achieve Silver Certification.

3
Tue Sep 15, 2015, 11:12 am

Rounding of Percent Energy Cost Savings for EAc1 Points

NC-2009 EAc1:Optimize Energy Performance
posted by  Joseph Chappell  on 

Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%.

11
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 14, 2015, 2:04 pm