EAc5 states that it is for 'base bldg' equipment and I have read their definition of base bldg as meaning permanently attached to the bldg, etc.
I think that means that, in a multi-tenant office building , tenant-owned HVAC or refrigeration equipment is excluded
Do you agree ?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
July 24, 2010 - 11:24 am
Stephen, for this credit LEED defines "base building" equipment as basically anything in the building with more than 0.5 pounds of refrigerant. This is defined and discussed in detail in the Checklists tab above and on page 209 of the EBOM Reference Guide.
Paul C
164 thumbs up
September 14, 2010 - 12:16 pm
Under Equipment location - the drop down menu states 'The LEED Project only' or 'Central Plant', I'm assuming if the equipment is within the building to put 'The LEED Project Only'?
John Beeson
Green Mystic in Residence107 thumbs up
September 15, 2010 - 9:25 am
Yeup. :)