Renewable Energy to improve EfficiencyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 17, 2010, 12:19 pm
If I have a PV system to offset the building energy use can I use it to show performance over 19% to meet the prerequisite (like in NC) or does the building efficiency stand alone to show 19%... Last reply: Jenny Carney, Jul 21, 2010, 2:45 pm |
|
varying occupancy thru time- for this and related creditsEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Jul 5, 2010, 8:12 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 5, 2010- 8:34 am Pablo, I think Jason had a good answer to your similar qustion on the WEp1 forum in this comment. I would say the bottom line is to use a consistent methodology that is reasonable for your project, and to make sure that it doesn't appear inconsistent to GBCI reviewers. Log in or register to post comments Jenny Carney Vice President WSP LEEDuser Expert 657 thumbs up July 12, 2010- 3:42 pm Pablo, for this particular credit it's important to follow the guidelines Energy Star establishes.... Last reply: Jenny Carney, Jul 12, 2010, 3:42 pm |
|
discrepancy in main meter and sub; calibrationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Jun 22, 2010, 1:19 am
1) if there is a discrepancy between the actual main meter of the energy supplier and the submeter total (sub meter total is around 8 to 10% less), which data should we input for the portfolio... Last reply: Pablo Fortunato Suarez, Jul 5, 2010, 8:07 am |
|
Steam Process loadsEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 16, 2010, 6:40 pm
Are steam process loads such as cage washing and glass cleaning included in these calculations and do they need to be monitored and included in the EUI values? How about domestic hot water... Last reply: Chris Nixon, Jun 17, 2010, 10:45 am |
|
InternaionProjects Benchmark- Building Location Not in EStarEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ashu Gupta on Jun 10, 2010, 2:55 am
We are doing a LEED EB project in India. EStar having only 4 locations in India, our project location is only 100 mile far away from the EStar specified location. Climate are almost same of both... Last reply: Jenny Carney, Jun 10, 2010, 11:06 pm |
|
Must the start of the P.P. align with the Registration date?EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Mike Williams on Jun 2, 2010, 8:50 am
After our preliminary energy audit we have determined that our building meets the minimum performance requirements for EAp2 achievement. This is based on the 12 months of data collected prior to... Last reply: Tristan Roberts, Jun 2, 2010, 9:00 am |
|
How to account for rented parking lot lighting?EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Kimberly Frith on May 21, 2010, 2:26 pm
Our facility is a 3-story suburban office building with one owner, and a large surface parking lot. All of the lighting in the parking lot is owned and maintained by the utility company, and we... Last reply: Jenny Carney, Jun 1, 2010, 2:19 pm |
|
Minimum OccupancyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Ian Journey on May 4, 2010, 2:31 pm
Does EAp2 require the building be minimally occupied. My client recently purchased a 10 story office building and is slowly converting it to lab space to be leased. The building is currently... Last reply: Jenny Carney, May 12, 2010, 10:38 am |
|
Water info?EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Rachael McClain on Apr 27, 2010, 2:43 pm
Hi, I was wondering if you need water bills to generate a Energy Star Rating. The Reference guide says "The energy data must include data from electricity, natural gas, fuel oil, diesel fuel,... Last reply: Corinna Kester, Apr 27, 2010, 2:48 pm |
|
Retail Space and EAp2/EAc1EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by D. G. on Apr 2, 2010, 8:08 pm
My question is about retail space and EAp2/EAc1. According to page xxiii of the Reference Guide, up to 10% of the floor area can be exempted from all credits (except EQp2) for multitenant... Last reply: D. G., Apr 19, 2010, 10:14 pm |