Pilot-Credits SSpc82:Local food productionposted by Francesco Passerini on
Hello, we want to pursue this credit, but we have a doubt. Under all project description says "Herbs used for food preparation shall not exceed 25% of the area requirement.
Gross area v. net area in PI Form 3 and IEQ8.1
NC-2009 PIf3:Occupant and Usage Dataposted by James Bell on
PI Form 3 requires gross area of Occupied Space.
Owner Provided Signage
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Summer Minchew on
I have a project that will have owner provided signage (naming signage) mounted to architectural canopies.
Roof Mounted Ventilation Intakes
posted by Tate Walker on
Is anyone aware of research or guidance that has looked at VOC’s from roofing products and ventilation intakes?
Fan - interior ventilation EFLH
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Hi,
i'm dealing with EFLH for interior ventilation in baseline and propose, over 8000h/year, double than another ones such us space cooling and receptacle EFLH, <4000h/year?
Greencircle certified products
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Vanessa Nelson on
Will a Greencircle certified flooring product meet the requirements?
Client (a police facility) has no fleet Green vehicles. They do have sufficient public parking to implement this credit.
NC-v4 LTc8:Green vehiclesposted by Lawrence Lile on
This police facility has a secure area for police cruisers, SWAT vehicles, and so on. None of the fleet vehicles are Green vehicles.
TSLA upload - where should we do it?
CS-v4 MPR1:Must be in a permanent location on existing landposted by Instra Ingenieros on
Dear all,
Demand Response Program available but building can't meet requirements
NC-v4 EAc4:Demand responseposted by Jason Garvens on
Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi