Log in
Forum » NC-2009 MRc1.1
Topic

Historic Building Restoration

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Glen Boldt on Nov 1, 2012, 8:59 pm

The building is being restored to an "historic condition." Do unfortunate additions (like CMU block in sealed up former window areas) subsequent to the "historic condition" need to be included...

Last reply: April Brown, Nov 3, 2012, 5:25 pm

Relocation

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Kath Williams on Oct 16, 2012, 5:02 pm

If you move a core and shell to a new location, it is building...

Last reply: Tristan Roberts, Oct 17, 2012, 10:13 am

basement level with outdoor terrace for roof?

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Erica Downs on Jan 23, 2012, 8:54 pm

We have basement level rooms that extend beyond the above-grade building footprint. Effectively, the terrace serves as the roof for these below-grade rooms. If the terrace will remain untouched...

Last reply: Tristan Roberts, Feb 17, 2012, 2:51 pm

Exterior envelope reuse

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Susan Robertson on Jan 12, 2010, 1:31 pm

I am working in a 35.000 s.f. student union building in a cumpus. The owner wants to remove the 40 year old exterior...

Last reply: Anne Nicklin, Jun 1, 2011, 3:07 pm

Reuse of building structure

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Adriana Hansen on Apr 11, 2011, 2:00 pm

Hello,

We are working with a major renovation in a stadium. The huge structural external columms will be maintained (100%), but the floor slabs will be demolished, except for some parts of...

Last reply: Tristan Roberts, Apr 23, 2011, 8:57 pm

Building Reuse

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Brian Blodnikar on Mar 10, 2011, 5:09 pm

We are constructing a new building next to the existing building, the two buildings will not be attached. Essentialy the client is building a new building to expand out of the existing building...

Last reply: Brian Blodnikar, Mar 14, 2011, 9:57 am

More than one existing building on site.

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Dave Wortman on Oct 15, 2010, 6:30 pm

Our site includes two existing buildings. One is being deconstructed, the other is being remodeled. Do we include the deconstructed building in the calculations for MR Credit 1.1?

Last reply: Anne Nicklin, Oct 22, 2010, 2:01 am

Major Renovation: Reuse: Foundation, Structural Steel, Etc.

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Sara LeMone on Jun 21, 2010, 1:37 pm

Currently working on a project where a 100,000sq.ft. PEMB is being demolished down to the steel...

Last reply: Tristan Roberts, Jul 19, 2010, 2:40 pm

Hazardous materials

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Mara Baum on Jun 15, 2010, 7:48 pm

Can anyone confirm that mold is considered to be a...

Last reply: Anne Nicklin, Jul 6, 2010, 2:42 am

Building Reuse Calculation, please clarify?

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by John Ida on Jun 1, 2010, 3:46 pm

What about metal stud assemblies: how do we break down the calculation by area if portions of the...

Last reply: Anne Nicklin, Jun 2, 2010, 1:38 am