Sharing Building-Level Energy Metering Data

NC-v4 EAc3:Advanced energy metering
posted by  Francis Hernández  on 

We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems.  The meters and submeters

1
Thu May 3, 2018, 4:20 pm

Compliant laboratory and medical equipment

NC-v4 WEc2:Indoor water use reduction
posted by  LEED Pro Consultant  on 

For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?

0

Lack of Sunday bus service

NC-v4 LTc5:Access to quality transit
posted by  Karen Joslin  on 

I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?

5
Sustainability Lead
PAE Consulting Engineers
LEEDuser Basic Member
5 thumbs up
Wed May 2, 2018, 5:40 pm

Base Building certifcation in progress

CI-2009 PIf5:Previously LEED Certified Details
posted by  Gail Napell  on 

we have a v2009 project in a base building that's in process for LEEDv2009 EBOM certification.  We're ready to submit the design credits for review, but the landlord doesn't expect to have the

2
Senior Sustainability Manager
JLL
LEEDuser Basic Member
10 thumbs up
Wed May 2, 2018, 5:40 pm

EPD as an alternative approach to comply with Option-4 requirements

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Osman   on 

Hi all,

Is it acceptable to quantify for the impact measures in the proposed building using EPD?

Thank you so much for your support,

Osman

1
Thu May 3, 2018, 2:37 am

Demolition Waste for entire building vs area designated to be LEED Certified.

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Timothy Hillhouse  on 

We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft.  Should all the construction waste & recycling only be calculated for the small area being cer

1
Thu May 10, 2018, 10:59 pm

D & C Team perform Commissioning, CxA only Verifies?

NC-2009 EAc3:Enhanced Commissioning
posted by  Adrian Arenas  on 

Our project is pursuing Enhanced Cx credit v2009.

0

Min. Number of Fixtures

NC-v4 WEc2:Indoor water use reduction
posted by  Cora Kenrick  on 

Hello Fellow Users,

 

Is there a minimum number of fixtures that a project is required to get the 6 points for this credit.

 

3
Energy Engineering Specialist
LEEDuser Basic Member
0 thumbs up
Tue May 1, 2018, 10:15 pm

materials not used in the original construction are verified in the re-evaluation of the certification?

LEED Recertification: When and How
posted by  ANDREZA PASSOS  on 

I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?