Case 1. Single Family
Option 1. Indoor Lighting (1.5 points)
Install high-efficacy lighting. Meet or exceed the requirements for lighting power density for hard-wired fixtures, as listed in Table 1.
Table 1. Points for reducing lighting power density

Maximum lighting power density (W/sf)

 Points

W/sq. ft.

W/sq. m.

 

0.72

7.7

0.5

0.60

6.5

1

0.48

5.2

1.5

The proposed fixtures used to calculate energy savings must be capable of meeting the recommended light levels (weighted average footcandles) in the Illuminating Engineering Society Lighting Handbook, 9th edition, for the given space type. Either calculate the needs for each space type, or use 16 as the weighted average footcandles for the home. In calculating lighting power density, follow these guidelines:
  • Use a lighting power density of 1.1 W per square foot (11.8 W per square meter) for rooms or portions of any rooms with less than the required hardwired lighting.
  • Account for all hard-wired fixtures in the home, including the garage and exterior lights (whether affixed to the home or freestanding).
  • Do not include portable table and floor lamps, appliance lights, or landscape lights.
  • Include step lights and undercabinet and cabinet lights.
  • For standard incandescent (a-line medium screw base) bulbs, assume 64 watts per socket.
  • For LED and Xenon lights, use actual wattages.
  • For fluorescent lighting, calculate wattage based on the assumptions in Table 2 or use the actual wattages installed.
Table 2. Assumptions for bulb wattage

 

Watts

CFL twist

14

CFL Covered

14

CFL Candelabra

9

Incandescent

64

Incandescent Candelabra

40

MR16

40

AND/OR

Option 2. Exterior Lighting (0.5 point)
All exterior lighting must be Dark Sky qualified and have motion sensor controls, integrative photovoltaic cells, photosensors, or astronomic time-clock operation. The following lighting is exempt: emergency lighting, lighting required by code for health and safety purposes, and lighting used for eye adaptation near covered vehicle entrances or exits.
Case 2. Multifamily
Option 1. Indoor Lighting (1.5 points)
Install high-efficacy lighting and/or lighting controls that achieve a reduction from the ENERGY STAR baseline. Complete the ENERGY STAR multifamily midrise worksheet for interior lighting.
Table 3. Points for reducing interior lighting from baseline

Percentage reduction

 Points

35%

0.5

45%

1

55%

1.5

AND/OR

Option 2. Exterior Lighting (0.5 point)
Complete the ENERGY STAR multifamily midrise worksheet for exterior lighting. Reduce exterior lighting wattage by at least 50%. All exterior lighting must be Dark Sky qualified.
Credit only available for projects using the EA prescriptive path’
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Case 1. Single Family
Option 1. Indoor Lighting (1.5 points)
Install high-efficacy lighting. Meet or exceed the requirements for lighting power density for hard-wired fixtures, as listed in Table 1.
Table 1. Points for reducing lighting power density

Maximum lighting power density (W/sf)

 Points

W/sq. ft.

W/sq. m.

 

0.72

7.7

0.5

0.60

6.5

1

0.48

5.2

1.5

The proposed fixtures used to calculate energy savings must be capable of meeting the recommended light levels (weighted average footcandles) in the Illuminating Engineering Society Lighting Handbook, 9th edition, for the given space type. Either calculate the needs for each space type, or use 16 as the weighted average footcandles for the home. In calculating lighting power density, follow these guidelines:
  • Use a lighting power density of 1.1 W per square foot (11.8 W per square meter) for rooms or portions of any rooms with less than the required hardwired lighting.
  • Account for all hard-wired fixtures in the home, including the garage and exterior lights (whether affixed to the home or freestanding).
  • Do not include portable table and floor lamps, appliance lights, or landscape lights.
  • Include step lights and undercabinet and cabinet lights.
  • For standard incandescent (a-line medium screw base) bulbs, assume 64 watts per socket.
  • For LED and Xenon lights, use actual wattages.
  • For fluorescent lighting, calculate wattage based on the assumptions in Table 2 or use the actual wattages installed.
Table 2. Assumptions for bulb wattage

 

Watts

CFL twist

14

CFL Covered

14

CFL Candelabra

9

Incandescent

64

Incandescent Candelabra

40

MR16

40

AND/OR

Option 2. Exterior Lighting (0.5 point)
All exterior lighting must be Dark Sky qualified and have motion sensor controls, integrative photovoltaic cells, photosensors, or astronomic time-clock operation. The following lighting is exempt: emergency lighting, lighting required by code for health and safety purposes, and lighting used for eye adaptation near covered vehicle entrances or exits.
Case 2. Multifamily
Option 1. Indoor Lighting (1.5 points)
Install high-efficacy lighting and/or lighting controls that achieve a reduction from the ENERGY STAR baseline. Complete the ENERGY STAR multifamily midrise worksheet for interior lighting.
Table 3. Points for reducing interior lighting from baseline

Percentage reduction

 Points

35%

0.5

45%

1

55%

1.5

AND/OR

Option 2. Exterior Lighting (0.5 point)
Complete the ENERGY STAR multifamily midrise worksheet for exterior lighting. Reduce exterior lighting wattage by at least 50%. All exterior lighting must be Dark Sky qualified.
Credit only available for projects using the EA prescriptive path’
See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Homes-v4 EAc13