Forum quick links
converting VOC content
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Adi Negara, LEED AP BD+C on
Hi I receive several MSDS for the coatings that will be used in our project and inside them, the VOC content is measured in Europe (EU) which are usually expressed in percentage % (w/w).
Minimum IAQ performance monitoring requirement
NC-v4 EQp1:Minimum indoor air quality performanceposted by sonali rajwade on
We are having query related to prerequisite requirement of monitoring in LEED BD+C V4.
Contractors Commitment - Materials Sub-Group
posted by Patty Lloyd on
Hi, we need 3-4 folks to volunteer to join us to work out a draft Materials section for the Contractors Commitment. Meeting set for 6/16 @ 2 PM CST.
Aircraft collision avoidance lighting in highrise buildings
EBOM-v4 SSc4:Light pollution reductionposted by Heather Appell on
Our project is a highrise office building in a downtown area.
Bird Control Safety
posted by Heather Holdridge on
I'm working with a project team that is looking into bird control options to prevent nesting/roosting/pooping on the scrim that is designed to scrim their building's facade. They are looking
Facade Role in LEED certification
posted by Leonardo Flores on
Hi LEEDusers.. I am new here and would like to hear any of your feedback on below. I understand that the facade or building envelope/enclosure of a building plays a role on EA and MR.
Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational Changes
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Sandra Lester on
We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes.
Flush-out applicable GFA
NC-v4 EQc4:Indoor air quality assessmentposted by Ricardo Sá on
Dear All,
In what relates to flush-out option, the guide specifies that 4 267 140 liters of outdoor air per square meter of gross floor area (GFA) should be supplied.
How to know when is the right time to submit for design review?
posted by Lauren Leatherbarrow on
The project is about to start (after the COVID-19) lockdown and so money is tight - so how long can we wait to submit for design review? This is my first LEED project how do I know when