Daylighting for perimeter zones or all?

NC-v4.1 EQc7: Daylight
posted by Junaid Mujahid on Sep 27, 2024, 9:00 am

Hi,

Internal zones which do not have any external facades nor any windows are required to be simulated for Option 2: Illuminance? I have several zones which are considered regularly...

Last reply: Elliot Glassman, Sep 30, 2024, 1:56 am

Manual Blinds Simulation Required?

NC-v4.1 EQc7: Daylight
posted by Peter Wildfeuer on Aug 8, 2024, 9:50 am

Hello,

I am attempting to use passive strategies to deal with glare. I want to avoid using any kind of blinds. The credit language seems to suggest that I still need to simulate them even...

Strategies to Adress Glare

NC-v4.1 EQc7: Daylight
posted by Ricardo Sá on Jul 19, 2019, 10:18 am

Dear All,

in what relates to this credit, LEED V4.1 allows credit achievement in projects where spaces have...

Last reply: Daniel Glaser, May 2, 2024, 10:22 am

Core and Shell- How to define the "regularly occupied space" since the interior layout is not determined yet

NC-v4.1 EQc7: Daylight
posted by IASON BOURNAS on Sep 15, 2021, 9:24 am

Hi,

We are working with a project that is not constructed yet (office building, Core and Shell). The building volume and facades have been decided, but the exact plan layout is not known...

Last reply: Summer Minchew, Nov 2, 2023, 8:27 am

Modeling Trees for Daylight Simulations

NC-v4.1 EQc7: Daylight
posted by Kate Sector on Feb 2, 2022, 4:44 pm

We have a project pursuing LEED v4/4.1 that is surrounded by large existing pecan trees. Should we be including modeled trees in our daylight study? The challenge is that these are deciduous...

Last reply: Daniel Glaser, Feb 4, 2022, 12:17 am

Glare control devices on interior glazing

NC-v4.1 EQc7: Daylight
posted by Elise Woestyn on Feb 1, 2022, 12:48 pm

Are glare control devices required only on exterior glazing?

Let's say we have an office (regularly occupied) with a single window looking to a classroom and no exterior glazing. Does this...

Glare control requirements for Nordic projects

NC-v4.1 EQc7: Daylight
posted by Medina Deliahmedova on Sep 14, 2021, 11:53 am

Dear All,

I am an engineer at Inform Design (consulting practice based in Sweden), and we are working on a large office building project which aims to acquire LEED certificate.

I...

Other buildings' sunlight reflection

NC-v4.1 EQc7: Daylight
posted by Greenlab on Jul 16, 2021, 12:32 pm

Does LEED require, in any analysis, that other surrounding buildings be created to simulate the sunlight reflections they can add?

e.g. occupant visual discomfort like glare can increase...

Last reply: Greenlab, Jul 16, 2021, 1:48 pm

Glare Control in a Historic Building

NC-v4.1 EQc7: Daylight
posted by J Schütz on Jun 29, 2021, 4:01 am

Dear all,

in one of our projects the historical listed facade is preserved. Due to the protection of historical monuments, only as few changes as possible may be made to the facade. This...

Daylight Simulation Calculations

NC-v4.1 EQc7: Daylight
posted by Jamie Dubbe on Nov 17, 2020, 10:10 am

After some research it appears there are a couple of ways to produce the simulation calculations - Insight, LightStanza - however neigther of these are rated as acceptable for use on Department...