Topic | Recent |
---|---|
Daylight CalculatorNC-v4.1 EQc7: Daylightposted by Junaid Mujahid on Nov 20, 2024, 3:21 am
The LEED v4.1 requires area input for which the lux levels are within the range for 9am AND 3pm. From my understanding of the credit language, it is required to average the 9am values for... Last reply: Collin Robinson, Nov 20, 2024, 10:03 am |
|
Sky type for Option 2: IlluminanceNC-v4.1 EQc7: Daylightposted by Junaid Mujahid on Oct 7, 2024, 2:17 am
If anyone has used IES-VE's RadianceIES application for Daylight Simulation Option 2: Illuminance, what sky type within RadianceIES should be selected for demonstrating compliance? ... Last reply: Christopher Widdowson, Oct 21, 2024, 2:53 pm |
|
Daylighting for perimeter zones or all?NC-v4.1 EQc7: Daylightposted by Junaid Mujahid on Sep 27, 2024, 9:00 am
Hi, Internal zones which do not have any external facades nor any windows are required to be simulated for Option 2: Illuminance? I have several zones which are considered regularly... Last reply: Elliot Glassman, Sep 30, 2024, 1:56 am |
|
Manual Blinds Simulation Required?NC-v4.1 EQc7: Daylightposted by Peter Wildfeuer on Aug 8, 2024, 9:50 am
Hello, I am attempting to use passive strategies to deal with glare. I want to avoid using any kind of blinds. The credit language seems to suggest that I still need to simulate them even... |
|
Strategies to Adress GlareNC-v4.1 EQc7: Daylightposted by Ricardo Sá on Jul 19, 2019, 10:18 am
Dear All, in what relates to this credit, LEED V4.1 allows credit achievement in projects where spaces have... Last reply: Daniel Glaser, May 2, 2024, 10:22 am |
|
Core and Shell- How to define the "regularly occupied space" since the interior layout is not determined yetNC-v4.1 EQc7: Daylightposted by IASON BOURNAS on Sep 15, 2021, 9:24 am
Hi, We are working with a project that is not constructed yet (office building, Core and Shell). The building volume and facades have been decided, but the exact plan layout is not known... Last reply: Summer Minchew, Nov 2, 2023, 8:27 am |
|
Modeling Trees for Daylight SimulationsNC-v4.1 EQc7: Daylightposted by Kate Sector on Feb 2, 2022, 4:44 pm
We have a project pursuing LEED v4/4.1 that is surrounded by large existing pecan trees. Should we be including modeled trees in our daylight study? The challenge is that these are deciduous... Last reply: Daniel Glaser, Feb 4, 2022, 12:17 am |
|
Glare control devices on interior glazingNC-v4.1 EQc7: Daylightposted by Elise Woestyn on Feb 1, 2022, 12:48 pm
Are glare control devices required only on exterior glazing? Let's say we have an office (regularly occupied) with a single window looking to a classroom and no exterior glazing. Does this... |
|
Glare control requirements for Nordic projectsNC-v4.1 EQc7: Daylightposted by Medina Deliahmedova on Sep 14, 2021, 11:53 am
Dear All, I am an engineer at Inform Design (consulting practice based in Sweden), and we are working on a large office building project which aims to acquire LEED certificate. I... |
|
Other buildings' sunlight reflectionNC-v4.1 EQc7: Daylightposted by Greenlab on Jul 16, 2021, 12:32 pm
Does LEED require, in any analysis, that other surrounding buildings be created to simulate the sunlight reflections they can add? e.g. occupant visual discomfort like glare can increase... Last reply: Greenlab, Jul 16, 2021, 1:48 pm |