Forum quick links
Forum
Topic
Replies
Recent
Indoor Air Quality Assessment Option 2 Path 2 : TVOC above 500µg/m3
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Julie Baines on
The Reference Guide states below:
0
Regd. ASHARE 90.1 version to be selected while swapping LEED V.4 to LEED V 4.1
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi all,
2
Thu Feb 6, 2025, 4:01 pm
Fan pressure rise baseline calculation
NC-v4 EAc2:Optimize energy performanceposted by Julio Fernandez Amodia on
Hi to all,
1
Fri Feb 21, 2025, 4:24 pm
Purchasing credit - Electronic Equipment and lamps option
EBOM-v4.1 MRc1:Purchasingposted by Catarina Costa Goncalves on
For LEED O+M v4.1 - Purchasing credit
0
1
Fri Feb 21, 2025, 4:13 pm
Regd. monsoon reheat coils used in terminal boxes in a hospital project for dehumidification & defrosting
NC-v4.1 EAp2:Minimum Energy Performanceposted by Anurag Ghosh on
Hi, we have a hospital project following ASHRAE 90.1 2013 and having cooling as the predominant system.
0
Existing envelope
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
We have a project that is a major renovation of an existing building.
3
Tue Feb 4, 2025, 3:23 pm
Paint VOC violation
NC-v4.1 EQc2:Low-Emitting Materialsposted by Summer Gorder on
If 100% VOC compliance is required for Paints and Coatings, what does this language mean "To meet the 100% requirement for VOC content evaluation, a VOC budget may be use?"
1
Tue Feb 4, 2025, 4:26 pm