Topic | Recent |
---|---|
Functions of the same productNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Hashir Usman on Mar 9, 2020, 11:40 am
Hi all, I would like to ask if the same tiles are being used in the toilets and at the stairs as well then can we count it as 2 separate products or it has to be one product? ...Last reply: Renee Shirey, Mar 9, 2020, 1:46 pm |
|
Industry-Wide EPD- error in description?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Megan White on Mar 29, 2017, 7:40 pm
Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the... Last reply: Hashir Usman, Mar 9, 2020, 11:37 am |
|
Exemplary Performance Threshold a Core & Shell ProjectNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Ben Austin on Mar 3, 2020, 3:13 pm
Is the threshold for exemplary performance for a CS project 20 EPDs? I assume that both the 1 pt threshold reduction logic (from 20 to 10) applies to the exemplary performance threshold (40 to 20... Last reply: Summer Minchew, Mar 3, 2020, 5:14 pm |
|
Environmental Product DeclarationsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Ricardo Sá on Jan 30, 2020, 10:02 am
Dear All, I have some questions regarding Building Product Disclosure and Optimization – Environmental Product Declarations.
Last reply: Bipin Karki, Jan 31, 2020, 9:14 am |
|
BPDO EPD Construction process SubmittalsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Chyanne Husar on Dec 3, 2019, 12:25 pm
We work with architects and contractors to prepare their LEED documentation and our projects require a separate LEED submittal process from Contractor to AOR. On the contractor side, we are... Last reply: emily reese moody, Dec 12, 2019, 1:43 pm |
|
How long are EPDs valid for?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Samantha Lee on Oct 29, 2019, 8:35 am
Hi all. I know that EPDs have an expiration date listed on them, but I think I have heard of a rule that as long as the product the EPD is for is purchased within the year of expiration, it... Last reply: Tristan Roberts, Nov 5, 2019, 9:50 am |
|
What are permanently installed products?NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Sara Hickman on Sep 23, 2019, 6:41 pm
I am pursuing Option 1. The credit says: "20 different permanently installed products." Would appliances count? Last reply: Sara Hickman, Oct 1, 2019, 1:14 pm |
|
LEED4.1 Multi-attribute optimization- life cycle impact reductions in embodied carbonNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Dionisio Franca on Mar 22, 2019, 3:04 am
Quoted from the 4.1 Beta: Option 2. Multi-Attribute Optimization (1 point) Last reply: David Posada, Sep 11, 2019, 8:01 pm |
|
How does the USGBC evaluate EPD expiration dates for projects with long construction periods.NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by James Howarth on Jun 25, 2019, 2:54 pm(https://leeduser.buildinggreen.com/forum/epd-expiration-date), but not necessarily when its installed. However, its probably safest to, as much as possible, ensure that the EPD's you are using aren't expired by the time of your review. If that's... Last reply: Mike Noon, Jun 26, 2019, 11:30 am |
|
Barriers in implementing material transparency in LEED v4 projectsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by SUSAN THOMAS on Apr 16, 2019, 1:27 pm
I am a master's student at State University of New York College of Environmental Science and Forestry doing my thesis in Barriers in implementing material transparency in LEED v4 projects. ...Last reply: SUSAN THOMAS, Apr 19, 2019, 7:03 pm |