Log in
Forum » NC-v4 EAc3
Loading...
Topic

EAc3- Clarification on the Advanced Energy Metering.

NC-v4 EAc3: Advanced Energy Metering
posted by Olawale Taiwo on Sep 5, 2018, 9:09 am

Hello All,

There seems to be some challenges with clarity on the wording of this credit instructions, our team Electrical Engineer and I had this conversation and it became necessary to...

Last reply: Marcus Sheffer, Feb 12, 2019, 6:51 pm

Advanced Energy Metering in Multi-Family Housing

NC-v4 EAc3: Advanced Energy Metering
posted by Allison Wilson on Feb 8, 2019, 3:16 pm

We're working on a dorm project with apartment style units such that it's essentially multi-family housing. Each apartment has a kitchen and is, according to my MEP, therefore being provided with...

Last reply: Marcus Sheffer, Feb 8, 2019, 3:43 pm

Advanced Energy Metering Whole Building Energy Sources

NC-v4 EAc3: Advanced Energy Metering
posted by susan eguia on Jan 10, 2019, 7:58 pm

Hi,

We have Fire Station project and submitted Advanced Meter Cutsheet for Electrical.

However, LEED Reviewer Team still required us to provide support documents which includes...

Last reply: Marcus Sheffer, Jan 14, 2019, 9:52 am

Process End Use- Manufacturing

NC-v4 EAc3: Advanced Energy Metering
posted by David Hubka on Sep 5, 2018, 4:46 pm

Hello,

We have a manufacturing project where 70%+ of the energy load is for the widget makers. None of the typical regulated end uses (e.g. space heating, interior lighting, domestic hot...

Last reply: David Hubka, Sep 7, 2018, 1:40 pm

Sharing Building-Level Energy Metering Data

NC-v4 EAc3: Advanced Energy Metering
posted by Francis Hernández on May 2, 2018, 5:58 pm

We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems.  The meters and submeters...

Last reply: Marcus Sheffer, May 3, 2018, 12:20 pm

NCv4- EAc Advanced Metering- VRF system

NC-v4 EAc3: Advanced Energy Metering
posted by Margaret Montgomery on Mar 5, 2018, 3:29 pm

We have a clinic project that is all electric, and will be submetering to meet the Advanced Metering criteria, but we're not finding clarity on one particular point. We will be submetering...

Last reply: Marcus Sheffer, Mar 5, 2018, 5:08 pm

remote access

NC-v4 EAc3: Advanced Energy Metering
posted by Antonio Macedo Filho on May 12, 2017, 3:32 pm

I'd like to know if the BMS collecting the meter data would already meet the requirement of remote access to the data or this data should be avaiable for all ocupants.
"The data must be...

Last reply: Marcus Sheffer, Jan 22, 2018, 2:22 pm

10% annual building consumption VS 10% of electrical panel's power load

NC-v4 EAc3: Advanced Energy Metering
posted by Jake Buckmiller on Jan 8, 2018, 10:53 am

Hi all,

Question regarding advanced energy metering. The credit require that any individual energy end use that uses 10% of more of the total annual consumption of the building must comply...

Last reply: Marcus Sheffer, Jan 8, 2018, 2:23 pm

Metering individual end uses > 10%

NC-v4 EAc3: Advanced Energy Metering
posted by Carmen Mielecke on Nov 2, 2017, 5:30 am

Hello good morming, I would like to discuss the following example: If the simulation result on building level is, that the end use of lighting is >10% and the end use of user...

Last reply: Marcus Sheffer, Nov 2, 2017, 9:35 am

Use of Whole Building model to predict the energy consumption for each meter

NC-v4 EAc3: Advanced Energy Metering
posted by Lise Dannesboe on Oct 11, 2017, 10:49 am

Hi.

Hope some can help.

In the LEED 2009 version you had to enter the energy consumption for the different measured systems from the Whole building simulation in ordre to see in the...

Last reply: Lise Dannesboe, Oct 12, 2017, 1:59 am