Forum quick links
To Parksmart or Not
NC-2009 MPR3:Must use a reasonable site boundaryposted by Kim Shinn on
Our project is a single building - an office building built atop a parking structure. Has anyone done a pro/con analys
Acoustic Performance Credit for Hospitals
Healthcare-v4 EQc9:Acoustic Performanceposted by Valentina Balbis on
Hello LEEDuser community,
I’m working on a project for a hospital, in the Netherlands Antilles.
Prerequisite Required Documentation
NC-v4 EAp3:Building-level energy meteringposted by Danilo Ilic on
What constitutes "Confirmation of permanently instaled meters" in the required documentation part?
Not complying with Smoking ban
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Wioletta Simlat on
Hi all,
Baseline HVAC System Type
NC-2009 EAp2:Minimum energy performanceposted by Michael Hammond on
Hi all,
Toilets: private or public?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
In a office building that is occupied by a private firm how shall be considered the toilets according to Table 6.4 of ASHRAE 62.1-2010? Private, since the property is private? Does it depend on the
About IT load influenced by project (%)
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by DAVE LI on
Hi Everybody,
Quality Views for Non-Regularly Occupied Spaces
CS-v4 INc1:Innovationposted by Lauren Wallace on
Our project is a cold dark shell restaurant space located in a park location.
CO2 Monitoring in Telephone Rooms
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Sue Clark on
I am working on a project with a number of small quiet rooms. These rooms are approximately 35sf and their purpose is to provide privacy for individuals during phone calls.
No cooling tower yet use the latent heat of water for a certain amount
CS-v4 WEc3:Cooling tower water useposted by Norbert Szircsak on
Dear All,
I hope someone could help me in an interesting question.