Condenser heat recovery pump
Healthcare-v2009 EAc1:Optimize energy performanceposted by Davide Liviero on
Hello everyone,
Question about IAQ - Option 1 - Path 1
NC-v4 EQc4:Indoor air quality assessmentposted by Roshni Lad on
Hello,
I am working on one of the GBCI comments for NC v4 project - in which I am being asked to provide the following:
ASHRAE 90.1-2016 and v4
NC-v4 EAc2:Optimize energy performanceposted by Mark Meaders on
Has anyone used ASHRAE 90.1-2016 as a baseline for a v4 project and know what the adjustment in points would be for this baseline?
Model the systems as described in the design documents
CS-2009 EAp2:Minimum Energy Performanceposted by Manuel Martin Delgado on
Hi,
REC Purchase Timing
CI-v4 EAc6:Green power and carbon offsetsposted by Jeffrey Palmer on
Due to REC pricing violitility it may make sense to purchase the credits earlier in the project. Can RECs be purchased before the LEED project is registered?
Zone Discharge and Zone Primary Airflow
NC-v4 EQp1:Minimum indoor air quality performanceposted by Luke Brooman on
I am looking for clarification on the Zone Discharge Airflow (Vdz) and Zone Primary Airflow (Vpz) values under the multiple zone systems.
v4.1 MRc5 option 2 with MRpc87
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Kyle Roth on
Can you use the pilot credit Verified Construction & Demolition Recycling Rates with the v4.1 Construction and Demolition Waste Management credit, option 2?
Airflow rates for pressure drop in LEED v4
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear everyone,
For one of our project we received the Review Comment regarding to pressure drop adjustment calculations.
It states that :
Certify a utility building without any occupands or occupied space
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Janine van den Kerkhof on
Hi all,