Not sure I'm satisfied with this credit
Pilot-Credits MRpc127:Timber Traceabilityposted by Raphael Sperry on
I guess this debate has been going on for a while but I don't think the new "Timber Traceability" credit is a huge step forward for the environment.
Wall Components
NC-v4 EQc2:Low emitting materialsposted by LUCY WILLIAMS on
When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the pai
Fog Installation on the rooftop
NC-v4 WEc1:Outdoor water use reductionposted by Christoph Keck on
Hi,
our project has a fog installation on it´s rooftop.
The water consumption of said installation would be 3,6 l/min.
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Chris Lombardo on
The project team pursued this pilot after achieving the MRcBPDO EPD/HPD credits, which allowed us to better understand the lifecycle of each product we anayzed from an environmental and human healt
Legal Wood - Wood Harvested on-Site?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Vincent Pieri on
We are working on the modernization of the Visitor's Center at the El Yunque National Rainforest in Puerto Rico. El Yunque is a USFS National Park, and the forest is managed by the USFS and U
Climate change and human-built landmasses
NC-v4.1 SSc2:Protect or Restore Habitatposted by Brooke Saba McDowell on
Rising tides are contributing to decreasing landmass around the globe, and due to climate change, there are now many climate refugees from island and coastal communities.
Pilot Credit INpc155
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vassil Vassilev on
Greetings,
In an attempt of following this Pilot credit, the following question (related to #1b. of the Requirements) appeared:
What's considered substantial completion if building is completed before the site?
NC-v4 SSp1:Construction activity pollution preventionposted by Adam Huckstep on
Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.
Construction of site continuing after building completed
NC-v4 MRp2:Construction and demolition waste management planningposted by Adam Huckstep on
Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.
What exactly Accessible Flooring means herewith in this credit language?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Jeevan Doifode on
For general office building which typically has flooring system with ceramic tiles and floorboxes for Data/voice.What exactly Accessible Flooring means herewith in this credit language?