Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Not sure I'm satisfied with this credit

Pilot-Credits MRpc127:Timber Traceability
posted by  Raphael Sperry  on 

I guess this debate has been going on for a while but I don't think the new "Timber Traceability" credit is a huge step forward for the environment.

3
Associate Principal, Global Social Equity Skills Leader
Arup
LEEDuser Basic Member
2 thumbs up
Fri Jan 28, 2022, 7:54 pm

Wall Components

NC-v4 EQc2:Low emitting materials
posted by  LUCY WILLIAMS  on 

When reporting for the wall, ceiling category under Option 1, do all of the interior partition components need to be complaint- the gypsum board, the tape, the joint compound, the studs and the pai

18
Director of Sustainability
Walker Architects
LEEDuser Premium Member
3 thumbs up
Fri Jan 28, 2022, 3:56 pm

Fog Installation on the rooftop

NC-v4 WEc1:Outdoor water use reduction
posted by  Christoph Keck  on 

Hi,

our project has a fog installation on it´s rooftop.

The water consumption of said installation would be 3,6 l/min.

3
CES Clean Energy Solutions GmbH
LEEDuser Basic Member
7 thumbs up
Fri Jan 28, 2022, 2:25 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Chris Lombardo  on 

The project team pursued this pilot after achieving the MRcBPDO EPD/HPD credits, which allowed us to better understand the lifecycle of each product we anayzed from an environmental and human healt

1
Fri Apr 8, 2022, 1:44 pm

Legal Wood - Wood Harvested on-Site?

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Vincent Pieri  on 

We are working on the modernization of the Visitor's Center at the El Yunque National Rainforest in Puerto Rico.  El Yunque is a USFS National Park, and the forest is managed by the USFS and U

0

Climate change and human-built landmasses

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Brooke Saba McDowell  on 

Rising tides are contributing to decreasing landmass around the globe, and due to climate change, there are now many climate refugees from island and coastal communities.

0

Pilot Credit INpc155

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Vassil Vassilev  on 

Greetings,

In an attempt of following this Pilot credit, the following question (related to #1b. of the Requirements) appeared:

0

What's considered substantial completion if building is completed before the site?

NC-v4 SSp1:Construction activity pollution prevention
posted by  Adam Huckstep  on 

Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.

1
Fri Jan 28, 2022, 3:49 pm

Construction of site continuing after building completed

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Adam Huckstep  on 

Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.

0

What exactly Accessible Flooring means herewith in this credit language?

CI-v4.1 MRc2:Interiors Life-Cycle Impact Reduction
posted by  Jeevan Doifode  on 

For general office building which typically has flooring system with ceramic tiles and floorboxes for Data/voice.What exactly Accessible Flooring means herewith in this credit language? 

1
Fri Jan 28, 2022, 2:27 pm