"..surface reflection and visibility of any surface 3 frit patterns.."
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maciej Starewicz on
In General Pilot Documentation Requirements we can find the following position:
>10% exemption possible?
EBOM-2009 MPR2:Must be a complete, permanent building or spaceposted by Rasita Masalskyte on
Hello, Has anyone heard of possibility to exclude >10% of building gross area that is under separate ownership and management? In our case such space makes 14%.
Outdoor air delivery monitor location?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Mindaugas Mi on
Dear Leeduser.com members, who could explain where exactly should the outdoor air delivery monitor should be located? Only at the outdoor intakes?
Car wash in parking garage
EBOM-2009 WEc1:Water Performance Measurementposted by Rasita Masalskyte on
Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary.
Solar panels serving another building
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Rasita Masalskyte on
If solar panels on our building‘s roof are serving another building‘s energy needs, can we still exclude these solar panels from calculations as mechanical equipment?
Reasonable Site Boundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by Mindaugas Mi on
Dear Leeduser.com members. I have a question regarding correct LEED boundary. 1.
Open parking under the building
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rasita Masalskyte on
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case.
Control devices required for meeting ASHRAE 55
CS-2009 IEQc7:Thermal Comfort—Designposted by Mindaugas Mi on
Dear Leeduser.com members. We have a question regarding whether we need these controls for meeting LEED credits under v2009 CS version. - Radiator heating system.
Filling the Minimum Performance Calculator for 100% OA
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Rasita Masalskyte on
SIngle 100% outdoor air AHU is serving multiple zones (through diffusers) on couple of floors in a highrise office building.
Top level parking_Option 1
NC-v4 SSc5:Heat island reductionposted by Rasita Masalskyte on
Hello, We're pursuing Option 1. Nonroof and roof. Questions: 1. Is a top level of multi storey parking garage exempt from Option 1 calculations if it has parking spaces?