I still don't understand how
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Nelina Loiselle on
I still don't understand how I am supposed to find out or calcuate int Rc? Is this a number you get from the manufacturer?
LEED-CI Commissioned system
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Adam Targowski on
LEED-CI Commissioned system I have a question concerning commissioned systems. The office which I would like to certify with LEED CI will have only interior lighting changed.
Access to LEED rating EBOM MRc4 form?
NC-2009 IDc1:Innovation in Designposted by Cynthia Ottenbrite on
We are using NC 2009, and looking to document an innovation point following EBOM MRc4: Mercury Reduction.
Case 2 calculator vs. Statement of Energy Performance
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by American University on
When I generate a Statement of Energy Performance for a non-rateable building, the SEP tells me that my building uses 23% less energy per square foot than the national median. 2 points, yay!
WEp1 Form - lav duration and "all fixtures installed >1/1/94"
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Lyle Axelarris on
I have two questions about the LEED Online WEp1 form: 1.
Defining number of parking spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Lisa Sawin on
We have a new office building that is on an Existing VA campus. There are no other LEED projects to date on the campus.
Insufficient Cooling Capacity
NC-2009 EAp2:Minimum Energy Performanceposted by Yoyo Shek on
Dear All, According to 90.1, the HVAC system shall follow the design for proposed case. I wonder what if the HVAC engineer under-sizes the cooling capacity.
MRc5 question:
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Heather Holdridge on
Does MRc5 count as an alternative to MRc2-4 or not? It seems like it does, however in the MRp1 policy document template it says it doesn't. Could someone please clarify? Thanks!
Signatory
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Kris Phillips on
My understanding is that the Owner must place her/his initials in the Signatory box for credits such as this one (No Smoking).
NAUF & CARB 2
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by John Casciato on
If a product meets CARB or CARB 2 compliance, does it meet this credits needs?