Forum quick links
Option 1: Filtration
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Rodolfo Loro, Jr. on
In Philippines which parameters shall be considered to identify whether an area is non-attainable for PM10 and PM2.5?
Credit Form - 25% vegetated requirement (Form has Error)
NC-v4 SSc3:Open spaceposted by Amarpreet Sethi on
The LEED User Guide clearly states in Equation 2.
LEED Campus - Large Site Area
NC-v4 SSc3:Open spaceposted by Anastasia Huggins on
We are looking at submitting this for a LEED Campus submittal but have some questions about the calculations.
Disturbed site
CS-v4 SSc3:Open spaceposted by Guillaume Rose on
Hello,
In the case of a rehabilitation project in the center of Paris, on a 100% mineral site, is this requirement applicable?
Define "transit route" for the extra point gained with no on route providing more than 60% of the documented levels
NC-v4 LTc5:Access to quality transitposted by Evie Bird on
Pertaining to this extra point in LEED v4 -"Projects served by two or more transit routes such that no one route provides more than 60% of the documented levels may earn one additional point, up to
Building site served by bus only
NC-v4 LTc5:Access to quality transitposted by alfonso senatore on
I'm currently involved in a project which is served by buses only (15+ different routes).
Do you know if the above is suitable for the Access to Quality Transit Credit?
Students (K-12) in ocupancy table for WE calcualtions
Schools-NC-v4 WEp2:Indoor water use reductionposted by Micaela Smulevich on
BPDO EPD Construction process Submittals
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Chyanne Husar on
We work with architects and contractors to prepare their LEED documentation and our projects require a separate LEED submittal process from Contractor to AOR. On the contractor side, we are s
planters on terraces
NC-v4 WEp1:Outdoor water use reductionposted by Agnieszka Rylska on
Can anyone confirm if planters located on the terraces should be included in the calculations for this credit?
roof under ventilation ducts and glass overhang
NC-v4 SSc5:Heat island reductionposted by Agnieszka Rylska on
I have two questions regarding heat island reduction credit: