I am working on a project in Quebec (where there is a lot of snow) and the client has requested a radiant heating system for an exterior concrete slab that links a ramp to an ambulance garage (to avoid having to mandate a snow removal company). I am wondering if that energy use is considered "process load" and shall be identical in the two scenarios (referenced and proposed), or if it should be taken as regulated energy. 

Thank you in advance !