Forum quick links
LEED AP NC applicable?
Mid-Rise-v4 INc2:LEED AP for Homesposted by Maria Perzon on
I am a LEED AP for NC. Would that qualify for 1 credit in the mid-rise homes version.
Four buildings in one certification?
Mid-Rise-v4 MPR2:Must use reasonable LEED boundariesposted by Maria Perzon on
I am working with a customer discussing LEED certification for four similar residential buildings. They have only minor variations.
Minimum planted area (that needs no irrigation)
CS-v4 WEc1:Outdoor water use reductionposted by Maria Porter on
Hi!
Automatic Daylighting Controls for Primary Sidelighted Areas in Core and Shell project
CS-v4 EAp2:Minimum energy performanceposted by Tien Duong on
Dear All,
Refrigerant Impact Calculation for DSE
Retail-CI-v4 EAc5:Enhanced refrigerant managementposted by Toshif Ruikar on
Hi,
I read the V4 ID+C guide, i am little bit confuse for reference credit.
Baseline HVAC system for existing building
NC-v4 EAp2:Minimum energy performanceposted by Ying Lindsey on
Dear All,
LEED Boundary with Main Building, Parking Garage & Parksmart
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ralph Bicknese on
We have a new 609,000 sf building seeking LEED BD+C v4 certification. A new 1800 space parking garage will be built design-build as part of the project but by separate designer, same CM.
Required documentation - credit form versus reference guide
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Dee Spiro on
I'm posing this question under this particular credit, but it's actually applicable to a number of credits in a number of the rating systems. For this credit, the credit form includes th
Required documentation - credit form versus reference guide
Retail-CI-v4 MRc2:Interiors life-cycle impact reductionposted by Dee Spiro on
I'm posing this question under this particular credit, but it's actually applicable to a number of credits in a number of the rating systems. For this credit, the credit form includes th
Many measurement points
EBOM-v4 EQc5:Daylight and quality viewsposted by Omar Elrawy on
We have a huge manufacturing facility, in which taking daylight measurements on 3m grid results in 400+ measurement points, which the client do not afford (cost and time wise), so is there any acce