Dear Everyone,
We model building under Core and Shell certification and the subject building is connected to District Hot Water System which is supplied by combined heat and power plants. The proposed and Baseline Case have been modelled according to ASHRAE 90.1-2010 Appendix G. However, the Baseline Case costs have been adjusted based on DES Path 3: Streamlined DES Modeling.
In order to obtain all the necessary data related to the production of CHP, the team turned to the local supplier DES. The supplier made them available to our company, but reserved their disclosure further.
Is it possible not to show data from the local DES supplier during the calculation, but only to show additional savings during the review?
Many thanks for help.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Tyler Thumma
7GroupLEEDuser Expert
67 thumbs up
October 20, 2020 - 1:59 pm
You may be able to request an exception for providing the raw data from the supplier, but will still likely need to provide some detail of the calculations that were used to determine the district hot water cost.