Topic | Recent |
---|---|
Air Curtains for a Fit-outRetail-CI-v4.1 MPR1: Must be in a permanent location on existing landposted by Dishant Khatri on Jul 29, 2024, 4:42 am
Hi, |
|
If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?NC-v4 MRp2: Construction and demolition waste management planningposted by Laura Stanley on Apr 15, 2021, 5:26 pm
Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020? I haven't had any luck finding info for this particular... Last reply: Dave Hubka, Jul 29, 2024, 8:10 am |
|
Can a solar water heating system be considered a renewable energy system?NC-v4 EAc5: Renewable energy productionposted by zz kelvin on May 27, 2022, 3:06 am
Can a solar water heating system be considered a... Last reply: Lyla Clara, Jul 29, 2024, 4:08 am |
|
Baseline Building DCVNC-v4.1 EAp2: Minimum Energy Performanceposted by Luis Andrade on Feb 2, 2024, 10:36 am
Hi everyone, I'm currently performing a PRM assessment of an Office building. ASHRAE 90.1 - 2016 has condensed in its appendix G all prescriptive information to model the Baseline building... Last reply: Luis Andrade, Jul 26, 2024, 12:52 pm |
|
GHG emissions Factors for LEED v4- 2024 UpdateNC-v4 EAc2: Optimize Energy Performanceposted by Keith Lane on Jul 23, 2024, 9:23 am
Is there a required source to obtain the... Last reply: Marcus Sheffer, Jul 26, 2024, 9:43 am |
|
fireproof calcium silicate panelNC-v4.1 EQc2: Low-emitting materialsposted by Paola Moschini on Jul 26, 2024, 3:35 am
Dear all, in a renovation project a fireproof calcium silicate panel is used as structural consolidation, it will be installed under a slab as an anti-collapse panel, and than the ceiling will be... |
|
IAQ Testing- When Does This Need to Occur?NC-v4.1 EQc4: Indoor air quality assessmentposted by Theresa Lehman on Nov 11, 2022, 1:21 pm
The LEED requirements state... Last reply: Lyla Clara, Jul 25, 2024, 5:05 am |
|
Air Testing- Particulate Matter and Inorganic Gases- measurement timeNC-v4.1 EQc4: Indoor air quality assessmentposted by Dionisio Franca on Jul 24, 2024, 9:46 pm
Hi! |
|
LEED Online submission languageLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Marcelo Alencar Pereira on Jul 24, 2024, 10:23 am
Can I submit projects, documents, technical sheets, and other files on the LEED Online platform in Portuguese/BR, or do I need to translate all of them into English? Should the descriptive texts... |
|
Default Recycled Steel Content, LEED v4NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by David Taylor on Aug 8, 2016, 5:32 pm
Under MR Credit Building Product Disclosure and Optimization, Source of Raw Materials, Option 2, Leadership Extraction Practices, Recycled Content, is there a default percentage for steel if the... Last reply: Afogreen Build, Jul 23, 2024, 9:09 pm |