Log in
Forum
Topic

Credit requirement wording: with the intention of multiyear renewal

NC-v4 EAc4: Demand response
posted by John Covello on Jun 7, 2022, 3:40 pm

Hello,

Does the contract have to state that it is eligible for renewal beyond the one year requirement? Is that what is meant by  "with the intention of multiyear renewal"? Or does this...

Last reply: John Covello, Jun 8, 2022, 11:48 am

Time for LEED 3.2 to Come to an End IAQ

SITES Discussion Forum
posted by Russ Pellegrino on Jun 8, 2022, 11:23 am

This really isn't a question but just an update...

For those of you who have been following me or are needing to do the...

Do off-street parking facilities that are not surface-parking require carpool or car-sharing parking

ND-Plan-v4 NPDc5: Reduced parking footprint
posted by Pongpitch J. on Jun 8, 2022, 12:38 am

Hi,

Our project does not have any surface parking (outdoor lots or single-story parking facilities not under habitable buildings). The project does not have any existing parking facilities...

Not enough parking space within a 60-meter range of the entrances to fit all preferred parking

ND-Plan-v4 NPDc5: Reduced parking footprint
posted by Pongpitch J. on Jun 8, 2022, 12:41 am

Hi,

The project plans to provide 10% carpool and shared-use vehicle parking; however, only some of the preferred parking can fit into the available lots within a 60-meter range of...

Building Area Method and Space-by-Space Method for lighting power density

NC-v4.1 EAp2: Minimum Energy Performance
posted by Ying Lindsey on Jun 6, 2022, 8:11 pm

Dear All,
I have a question regarding lighting power...

Last reply: Ying Lindsey, Jun 8, 2022, 1:18 am

Can warehousing ramp lighting for transportation exempt from Light Pollution Reduction

CS-v4 SSc6: Light Pollution Reduction
posted by yingling guan on Jul 6, 2020, 4:13 am

There is a warehouse building project, with outdoor transport ramp beside buildings.  Many exterior lighting designed on the ramp for directional and marker lighting for transportation, are they...

Last reply: yingling guan, Jun 7, 2022, 11:02 pm

Entire building vs tenant space recyclables collection

CI-v4.1 MRp1: Storage and Collection of Recyclables
posted by Neumann Monson on Jun 3, 2022, 6:59 pm

The credit language says the project needs to provide dedicated areas for collection and storage for the "entire building".  If a project is a tenant space within a larger existing mixed use...

Last reply: Jim Nicolow, Jun 7, 2022, 7:21 pm

Thermal comfort controls

NC-v4 EQc5: Thermal comfort
posted by Alexandre DENEUVILLE on May 16, 2022, 5:38 am

Hello,

For the credit Thermal comfort, what alternative can we have other than remote controls to regulate thermal comfort in spaces where there is a significant number of occupants such...

Last reply: emily reese moody, Jun 7, 2022, 7:20 pm

Baseline System Type

Hospitality-NC-v4 EAp2: Minimum Energy Performance
posted by Nikos Tsitsikas on Jun 7, 2022, 10:35 am

Hi all,

We are currently working on a project which is a building with two levels - Ground floor level and Level 01. Level 01 is 1,000 m2 and consists of hotel rooms, whereas Ground floor...

Last reply: Marcus Sheffer, Jun 7, 2022, 3:22 pm

O’Brien360 is looking for another exceptional colleague to join our commercial consulting team!

Help Wanted: LEED-related Jobs
posted by Elizabeth Powers on Apr 1, 2022, 3:34 pm

Commercial Green Building Rating System Project Assistant

O’Brien360 is looking for another exceptional colleague to join our commercial consulting team. We are seeking a project assistant...

Last reply: Lynnel Hampton-Bott, Jun 7, 2022, 1:33 pm