Topic | Recent |
---|---|
SITES CalculatorsSITES Discussion Forumposted by Dalia Abdalla on Jul 27, 2023, 3:13 am
Hello, I noticed that the SITES calculator are only available upon project registration. Is there any other way around to get these calculators as there are requirements that we would like... |
|
Off street parking and on street parkingNC-v4 LTc7: Reduced parking footprintposted by Azaz Ansari on Nov 21, 2017, 8:03 pm
Gentlemen, 1. Could you please explain the following statement: "Preferred parking is not required if no offstreet parking is provided". 2. What is difference between off... Last reply: Emma Loris, Jul 27, 2023, 2:42 am |
|
2-year Establishment PeriodNC-v4 WEp1: Outdoor water use reductionposted by Kun liu on Jun 19, 2023, 3:43 pm
We are working on a project in South Holland, IL. WE PREREQUISITE _ Outdoor Water Use Reduction option 1 requires a maxiumn two-year establishment period. ... Last reply: Afogreen Build, Jul 27, 2023, 2:23 am |
|
Parking spaces under tree canopy can be counted under the Option 2: Parking under coverNC-v4 SSc5: Heat Island Reductionposted by Thomas Tan on Feb 18, 2019, 1:55 am
Dear LEED Experts, Our parking spaces consist of two parts: one park is under a roof... Last reply: Afogreen Build, Jul 27, 2023, 2:22 am |
|
Equivalent to Watersense for UKCI-v4.1 WEp1: Indoor water use reductionposted by Lidia Johansen on Jul 24, 2023, 6:02 pm
Is there a UK equivalent for WaterSense label please? Last reply: Dave Hubka, Jul 26, 2023, 9:41 pm |
|
Please advise the canopy connected between two building is considered as roof or non roofNC-v4 SSc5: Heat Island Reductionposted by Eka Ussa on Dec 7, 2022, 8:55 pm
Greeting. Can anyone advise wheter the canopy connected between two building is consider as roof or non roof according to the SSc5 Heat Island Reduction. The under canopy is road and... Last reply: Afogreen Build, Jul 26, 2023, 9:25 pm |
|
Pervious concrete to drainageNC-v4 SSc4: Rainwater managementposted by Omar Elrawy on Feb 27, 2023, 4:49 am
Hi, Can we comply by using pervious concrete, knowing that the water will not be collected, will just be discharge to perimeter drain? Last reply: Afogreen Build, Jul 26, 2023, 9:23 pm |
|
Definition of a Laboratory SpaceNC-v4 EAp2: Minimum Energy Performanceposted by Michael Hill on Jul 26, 2023, 6:24 pm
I am working on a project which is a facililty that tests tools used in semi-conductor fabrication facilities. The spaces are clean rooms with strict control of temperature, humidity, and... Last reply: Marcus Sheffer, Jul 26, 2023, 7:02 pm |
|
Recycled ContentRetail-NC-v2009 MRc4: Recycled Contentposted by Steve Willey on Jul 26, 2023, 2:35 pm
If Im look for Recycled content, post and pre consumer and all i can find is the total... Last reply: Umesh Atre, Jul 26, 2023, 4:45 pm |
|
Multi attribute optimization (option 2)CS-v4.1 MRc2: Environmental Product Declarationsposted by Michael dickson on Jun 12, 2020, 4:36 pm
i am having a lot of trouble understanding the lauange used to decribe this option if someone can help me understand what i need to acomplish to earn this credit that would ba amazing ... Last reply: Lauren Richardson, Jul 26, 2023, 4:02 pm |