Log in
Forum
Topic

Baseline system in ASHRAE 90.1 G3.1.1

NC-v4 EAp2: Minimum Energy Performance
posted by Eric Dyer on Sep 13, 2023, 4:30 am

Hello,

I have a question in the process of creating a baseline system in our modelling.
Our project is in System8.

System8 is described in ASHRAE 90.1 G3.1.1 as "each floor...

Last reply: Eric Dyer, Sep 13, 2023, 7:30 pm

Fire and Police Station Building Type Use

NC-v4.1 LTc7: Reduced parking footprint
posted by Danielle Waters on Sep 13, 2023, 4:47 pm

I saw on LEEDuser v4 NC LTc7 that Fire Stations could be "General Light Industrial" (1.85/1000 sf), but is it far fetched to consider "Other Public Assembly" (0.25*permitted capacity) if the...

Police Headquaters and Public Services Building

NC-v4 LTc7: Reduced parking footprint
posted by Marlene Borruso on Dec 12, 2018, 8:47 am

I am currently working on a Police Headquarters and Public Services Building. This project utilizes a parking deck adjacent to the building and reserving spaces for both police vehicles, staff...

Last reply: Danielle Waters, Sep 13, 2023, 4:29 pm

Should we track quantity and costs for profiles and caps/wall base moldings?

NC-v4.1 EQc2: Low-emitting materials
posted by Priscillia Champagne on Sep 12, 2023, 1:50 pm

I am wondering if edging profiles (like Schluter systems let's say) as well as wall base caps and moldings (like Tarkett finishing accessories) need to be tracked for the Flooring Category. In...

Last reply: Priscillia Champagne, Sep 13, 2023, 4:16 pm

Want to consider 30% fresh air in printing areas

CI-v4 EQp1: Minimum indoor air quality performance
posted by Nagaraj Sankar on Sep 10, 2023, 11:23 pm

Hi users,
One of office project having printing spaces in open office. It is in the name of repro. As per LEED Requirement, whether this space should be negatively pressurised or not....

Last reply: Nagaraj Sankar, Sep 13, 2023, 12:53 am

Pre-cast concrete structure environmental product declarations

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Maiz Rech on Sep 11, 2023, 2:17 pm

Considering the building is built of a precast concrete...

Which buildings/structures to consider while registering project

EBOM-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Wafa Arif on Sep 11, 2023, 4:28 am

I have three office towers on one large property, each connected to a mall via walkways. The shared parking structures beneath these towers serve tenants, mall visitors, and others. My objective...

Basement carpark areas?

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Scott McMillan on Jul 2, 2015, 11:54 pm

As noted above the requirement is applicable to "All adhesives and...

Last reply: Ahmed Ashraf Abdelfattah, Sep 11, 2023, 3:00 am

DES Owned by A Third Party

NC-v4 EAp4: Fundamental Refrigerant Management
posted by Candice Rogers on Sep 8, 2023, 12:03 pm

Hello -

We have a project pursuing certification that is served by a...

Last reply: Candice Rogers, Sep 9, 2023, 2:55 pm

Waste-to-Energy diversion

NC-v4.1 MRp2: Construction and demolition waste management
posted by Danielle Waters on Sep 7, 2023, 1:04 pm

In LEED v4,...

Last reply: Dave Hubka, Sep 7, 2023, 2:17 pm