Log in
Forum
Topic

Framed assembly U-value calculation

NC-v4 EAc2: Optimize Energy Performance
posted by Sarah Leenknegt on May 23, 2024, 7:28 am

Hi

According to the review for our Project in Germany, we have to provide information to confirm that the framed assumbly...

Last reply: Marcus Sheffer, May 23, 2024, 11:23 am

Measuring TVOCs

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Rick Alfandre on Aug 1, 2019, 4:06 pm

Basic Member 456 thumbs up May 26, 2020- 6:52 pm Hi Rick- just in case you haven't seen it, there's another forum thread that also covers this topic: https://leeduser.buildinggreen.com/forum/ppb-ugm3-arcskoru. There might be some useful information in there. And if you found a good solution please drop a note into the forum and let us know! Log in or register to post comments Ira Caplan LEEDuser Basic...

Last reply: Ira Caplan, May 23, 2024, 10:26 am

Materials and Resources | Optimized Building Products

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by Jens Ewert on May 23, 2024, 4:54 am

Concrete Sustainability Council (CSC) responsible sourcing certification for concrete pertains to sustainable sourcing and manufacturing practices for concrete. It addresses similar attributes...

Climate Resilience Assessment

LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Comments
posted by Birgitte Messerschmidt on Apr 29, 2024, 3:45 pm

It's great to see that Wildfire and Smoke are on the list of hazards to be considered. However, it is not clear to me who decides which hazards are the most impactful and on what that assessment...

Last reply: Simona Kabadova, May 23, 2024, 9:05 am

Water Metering for LEED Group: Single Meter for 3 Buildings?

NC-v4 WEp3: Building-level water metering
posted by Mike Refsland on May 22, 2024, 5:36 pm

I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group. The design team would like to provide 1 potable water meter that serves all 3...

Question about Innovation: Purchasing- lamps for LEED v4 ID+C

CI-v4 INc1: Innovation
posted by Courtney Royal on Apr 10, 2020, 11:15 am

I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire...

Last reply: Catarina Costa Goncalves, May 22, 2024, 11:54 am

Purchasing- Lamps: EXIT signs

NC-v4 INc1: Innovation
posted by Edgar Arevalo on Feb 5, 2024, 3:14 pm

I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator.  Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and...

Last reply: Catarina Costa Goncalves, May 22, 2024, 11:52 am

LEED BD+C: New Construction

LEED v5 BD+C/ID+C: Overall and Appendix Public Comments
posted by Andrea Wald on May 22, 2024, 12:34 am

LEED certification needs to address the topic of artificial turf. Specifically, a prerequisite for LEED certification should be that the design includes no artificial turf. Credits and points...

LEED v5 O&M Existing Buildings public comments

LEED v5 O&M Existing Buildings Public Comments
posted by Nadav Malin on Apr 2, 2024, 1:57 pm

Share your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum. You can either reply to this thread or use the "Post a Question/Comment" button to start a...

Last reply: Lyle Axelarris, May 22, 2024, 9:41 am

No-Cooling Tower for full credit? Option 2- Optimize Water Use for Cooling- 100% Reduction

CS-v4.1 WEc3: Optimize Process Water Use
posted by Grace Friedhoff on Feb 24, 2022, 3:08 pm

I am working on a C&S project that has a baseline system designated for the building using ASHRAE 90.1-2016 Appendix G Table G3.1.1 that includes a cooling tower (system 7) AND there is no...

Last reply: Kathy Collins, LEED AP , WELL AP, May 22, 2024, 9:12 am