Topic | Recent |
---|---|
Framed assembly U-value calculationNC-v4 EAc2: Optimize Energy Performanceposted by Sarah Leenknegt on May 23, 2024, 7:28 am
Hi According to the review for our Project in Germany, we have to provide information to confirm that the framed assumbly... Last reply: Marcus Sheffer, May 23, 2024, 11:23 am |
|
Measuring TVOCsEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Rick Alfandre on Aug 1, 2019, 4:06 pmBasic Member 456 thumbs up May 26, 2020- 6:52 pm Hi Rick- just in case you haven't seen it, there's another forum thread that also covers this topic: https://leeduser.buildinggreen.com/forum/ppb-ugm3-arcskoru. There might be some useful information in there. And if you found a good solution please drop a note into the forum and let us know! Log in or register to post comments Ira Caplan LEEDuser Basic... Last reply: Ira Caplan, May 23, 2024, 10:26 am |
|
Materials and Resources | Optimized Building ProductsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Jens Ewert on May 23, 2024, 4:54 am
Concrete Sustainability Council (CSC) responsible sourcing certification for concrete pertains to sustainable sourcing and manufacturing practices for concrete. It addresses similar attributes... |
|
Climate Resilience AssessmentLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Birgitte Messerschmidt on Apr 29, 2024, 3:45 pm
It's great to see that Wildfire and Smoke are on the list of hazards to be considered. However, it is not clear to me who decides which hazards are the most impactful and on what that assessment... Last reply: Simona Kabadova, May 23, 2024, 9:05 am |
|
Water Metering for LEED Group: Single Meter for 3 Buildings?NC-v4 WEp3: Building-level water meteringposted by Mike Refsland on May 22, 2024, 5:36 pm
I'm working on a project pursuing LEED v4 Group, New Construction, with 3 separate buildings in the LEED Group. The design team would like to provide 1 potable water meter that serves all 3... |
|
Question about Innovation: Purchasing- lamps for LEED v4 ID+CCI-v4 INc1: Innovationposted by Courtney Royal on Apr 10, 2020, 11:15 am
I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire... Last reply: Catarina Costa Goncalves, May 22, 2024, 11:54 am |
|
Purchasing- Lamps: EXIT signsNC-v4 INc1: Innovationposted by Edgar Arevalo on Feb 5, 2024, 3:14 pm
I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator. Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and... Last reply: Catarina Costa Goncalves, May 22, 2024, 11:52 am |
|
LEED BD+C: New ConstructionLEED v5 BD+C/ID+C: Overall and Appendix Public Commentsposted by Andrea Wald on May 22, 2024, 12:34 am
LEED certification needs to address the topic of artificial turf. Specifically, a prerequisite for LEED certification should be that the design includes no artificial turf. Credits and points... |
|
LEED v5 O&M Existing Buildings public commentsLEED v5 O&M Existing Buildings Public Commentsposted by Nadav Malin on Apr 2, 2024, 1:57 pmShare your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum. You can either reply to this thread or use the "Post a Question/Comment" button to start a... Last reply: Lyle Axelarris, May 22, 2024, 9:41 am |
|
No-Cooling Tower for full credit? Option 2- Optimize Water Use for Cooling- 100% ReductionCS-v4.1 WEc3: Optimize Process Water Useposted by Grace Friedhoff on Feb 24, 2022, 3:08 pm
I am working on a C&S project that has a baseline system designated for the building using ASHRAE 90.1-2016 Appendix G Table G3.1.1 that includes a cooling tower (system 7) AND there is no... Last reply: Kathy Collins, LEED AP , WELL AP, May 22, 2024, 9:12 am |