Topic | Recent |
---|---|
One Greenguard Certificate for the same product marketed by Multiple Companies?NC-v4.1 EQc2: Low-emitting materialsposted by Tiffany Beffel on Sep 19, 2024, 9:32 pm
Our project used Shaw 4151 LVT Universal Adhesive. Shaw Contract literature makes claim to a Greenguard Certificate that is for the same 4151 universal adhesive, however, the certificate... Last reply: Tiffany Beffel, Oct 12, 2024, 12:47 pm |
|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Chris Lombardo on Apr 13, 2021, 1:37 pm
The project team pursued this pilot using material data gathered for both BPDO credits. While some sections in the calculator are not applicable, the completed sections did provide clarity on the... Last reply: Tazrin Islam, Oct 11, 2024, 5:23 pm |
|
Overall Feedback on Pilot CreditPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm
As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest... Last reply: Michelle Rosenberger, Oct 11, 2024, 3:49 pm |
|
PV system energy going directly to the gridNC-v4 EAc2: Optimize Energy Performanceposted by Camilo Velez on Oct 7, 2024, 4:40 pm
Good afternoon everyone, We are currently working on a project that is implementing a PV solar array, which will primarily be used for EV charging, but besides that, any excess energy is... Last reply: Camilo Velez, Oct 11, 2024, 11:16 am |
|
Social Equity Within The Supply ChainPilot-Credits IPpc144: Social equity within the supply chainposted by Atlas Turner on Feb 28, 2023, 3:53 pm
The updated Social Equity within the Supply Chain appears to be more achievable. The original required permanently installed products from 10 different manufacturers meeting options 1 or... Last reply: Maria Moreira, Oct 11, 2024, 7:17 am |
|
Heat Island Mitigation with Cool WallsNC-v4 INc1: Innovationposted by Nohemi Mena on Sep 6, 2023, 12:45 pm
Hello everyone! Im working on a project pursuing the SS Pilot Credit: Heat Island Mitigation with Cool Walls, but the paint manufacturer is Sherwin Williams and does not disclose the... Last reply: Dulce Solis, Oct 10, 2024, 5:38 pm |
|
Definition of Informal TransitNC-v4 LTc5: Access to quality transitposted by Michelle Rosenberger on Oct 10, 2024, 12:21 pm
What is the definition of informal transit that is referenced in v4 Step 2 guidance? Last reply: Michelle Rosenberger, Oct 10, 2024, 12:52 pm |
|
IAQ testing credit substitution backwards from 4.1 to 4.0?NC-v4.1 EQc4: Indoor air quality assessmentposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Sep 30, 2024, 5:15 pm
Hi all, I have heard that some teams have done a credit substitution from a v4.1 (New Construction) project backwards to the v4.0 criteria. I am somewhat skeptical of being able to do this... Last reply: Jeff Ross-Bain, PE, LEED Fellow, WELL AP, Oct 9, 2024, 10:32 am |
|
Switching Options Post-Preliminary Design ReviewNC-v4 LTc4: Surrounding density and diverse usesposted by Darrah Jakab on Oct 8, 2024, 6:27 pm
We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1. Has anyone switched options post-... Last reply: Dave Hubka, Oct 9, 2024, 8:58 am |
|
Only FSC should count as a preferred paper product under Green CleaningLEED v5 O&M Existing Buildings 2nd Public Commentposted by Nadav Malin on Oct 9, 2024, 6:52 am
In the Green Cleaning credit under Janitorial Paper options, both... |