Is Zoysia japonica turf?

NC-v4 WEp1: Outdoor water use reduction
posted by Linh Dang on Dec 23, 2022, 6:17 am

Dear all LEED user expert

We use Zoysia japonica for landscape. now we dont know is Zoysia turf or groundcover? if it is turf , how can i approve that is groundcover? Thanks...

Last reply: Afogreen Build, Mar 25, 2024, 9:13 pm

Commercial Kitchen Query

CI-v4 EAp2: Minimum Energy Performance
posted by padma priya on Mar 7, 2024, 6:30 am

In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. 

Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am

Industrial Process Loads and the Exceptional Calulation Method

NC-2009 EAc1: Optimize Energy Performance
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Apr 16, 2014, 4:22 pm

We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use. Therefore, even if the non-process building portion was Net Zero Energy, we would not...

Last reply: Abdullah Tahir, Mar 25, 2024, 1:39 am

Modeling only conditioned area

NC-v4 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Dec 9, 2020, 10:05 pm

I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?
The factory is high on process loads, which will make it impossible to achieve...

Last reply: Abdullah Tahir, Mar 25, 2024, 1:38 am

Walk off mats for skyway entrance

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm

Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "...

Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm

Storage location

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Maiz Rech on Sep 11, 2023, 1:33 pm

Is there a minimum distance or positioning requirement for this area?

Would it be a problem to locate the recyclables storage on the building underground floor?

Last reply: Thomas Lagarde, Mar 22, 2024, 2:28 pm

Buildings within site but not under LEED scope

NC-v4 EQp2: Environmental tobacco smoke control
posted by Marwa Elzoghby on Mar 22, 2024, 10:44 am

I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to...

Building Envelope Commissioning

NC-v4 EAc1: Enhanced Commissioning
posted by Chris Bennett on Feb 16, 2018, 5:29 pm

Hello All, 

Has anyone gone through the process of building envelope...

Last reply: sooha ham, Mar 21, 2024, 4:09 am

Overall Feedback on Pilot Credit

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm

As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest...

Gross Floor Area

CI-v4 MPR3: Must comply with project size requirements
posted by Edgar Arevalo on Mar 21, 2024, 3:09 pm

For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage.  Since...