innovation creditsNC-v4 INc1: Innovationposted by Alexandre DENEUVILLE on Jun 17, 2022, 4:45 am
hello, for innovation credits ( for example Innovation: Occupant comfort survey ) when submitting the Design stage file is it possible to justify the credit with a letter of commitment... Last reply: Susan Di Giulio, Jun 17, 2022, 3:38 pm |
|
No-Smoking Signs- Warehouse Loading Dock & Overhead DoorsNC-v4 EQp2: Environmental tobacco smoke controlposted by Kristina K on Jun 16, 2022, 4:35 pm
Hello, Are no-smoking signs required to be installed for loading dock & overhead doors? Thank you. Last reply: Dave Hubka, Jun 17, 2022, 11:14 am |
|
Exclusive Parking LocationNC-v4 LTc8: Green vehiclesposted by Sofia Barahona on Nov 14, 2019, 3:23 pm
The preferred parking spaces of... Last reply: Michael Mousa, Jun 16, 2022, 10:59 am |
|
Outside Temperature Adjustment FactorEBOM-v4.1 EAp3: Energy Performanceposted by Julie Hendricks on Nov 9, 2020, 11:44 pm
The calculation for determining the outside temperature adjustment factor in the... Last reply: Francisca Gonzalez, Jun 15, 2022, 5:58 pm |
|
Exempt from Indoor Water Efficiency pre-requisite?NC-v4 WEp2: Indoor water use reductionposted by Lawrence Lile on Feb 21, 2018, 12:23 pmthumbs up June 15, 2022- 5:34 pm Hi Analu, Please refer to these two posts under the CI forum page for the Prereq that should address your question: https://leeduser.buildinggreen.com/forum/water-use-reduction-base-buildi... https://leeduser.buildinggreen.com/forum/no-existing-and-new-fixtures If for some reason those links don't function, just do a term search on the left side of that forum page for the word... Last reply: emily reese moody, Jun 15, 2022, 5:34 pm |
|
Indoor Water Usage Prerequisite RequirementsCI-v4 WEp1: Indoor water use reductionposted by rakesh bhatia on Aug 12, 2020, 3:41 am
In the reference guide of LEED ID+C V4, it is mentioned under prerequisite the newly installed plumbing fixtures must be according to the Table 6 flow rates. The % savings must be shown for... Last reply: emily reese moody, Jun 15, 2022, 5:29 pm |
|
browser compatibilityNavigating LEED Onlineposted by emily reese moody on Mar 22, 2017, 7:43 pmI have not personally used the information in this link for Acrobat vs. Reader - https://forums.adobe.com/thread/1866645- you might check it out. On another note, due to changing circumstances in my personal and professional life, I am no longer the LEEDuser Expert for this forum. While I'm not going away, I'm also not going to be keeping up with this forum on a regular basis.... Last reply: emily reese moody, Jun 14, 2022, 3:47 pm |
|
ECOREGION LEVEL III PLANT LISTS??NC-v4.1 SSc2: Protect or Restore Habitatposted by Sara Hicks on Jan 4, 2022, 12:02 pm
Anyone have a suggestions on how to find native plants as specific as the ecoregion required? I can't find any resources that provide this information. Last reply: Cynthia Kaplan, Jun 14, 2022, 1:09 pm |
|
Electric Vehicles Option 1 requirementsNC-v4.1 LTc8: Electric Vehiclesposted by Olivera Nikolic on Jun 13, 2022, 8:24 pm
Could you please advise if the below interpretation of LTc8 credit/ Option 1 is correct: The building has a total parking capacity of 500 spaces. The project team decides to install EVSE... |
|
Epoxy resin groutNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by soha yamani on Dec 9, 2018, 2:04 am
I have a material submittal for three component multi purpose fluid epoxy resin grout , that is used for concrete column repairing and strengthening under which category should this be... Last reply: Ahmed Ashraf Abdelfattah, Jun 14, 2022, 5:45 am |