Quality Transit- Exemplary Performance under LEED v4.1NC-v4.1 LTc5: Access to quality transitposted by Susan Di Giulio on May 18, 2022, 7:19 pm
Is the V4 exemplary performance path of double the max required number of trips valid under v4.1? I don't see it mentioned anywhere in the ref guide or addenda, either as existing or as having... |
|
Increased Ventilation- Strategies 5 and 6NC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Kelli Kimura on Aug 4, 2021, 4:47 pm
Hi all, Curious if anyone has pursued the newest v4.1 language going after six out of ten possible strategies for 2 pts and have looked at Strategies 5 and 6 for increased ventilation.... Last reply: Michelle Bombeck, May 18, 2022, 1:48 pm |
|
Indoor Water Use Reduction Calculator for HotelsNC-v4 WEp2: Indoor water use reductionposted by Kyle G. Pearson on Aug 27, 2019, 11:32 am
I am working on a 5 story hotel in San Jose, California. I'm trying to finalize the Indoor Water Use Reduction Calculator. The water closets (4 types) have identical gpf rates, so I've left... Last reply: ANCHAL AGARWAL, May 18, 2022, 9:44 am |
|
Under slab insulation required on raised heated (radiant) floor slabs?Healthcare-v4 EAp2: Minimum Energy Performanceposted by Deb Favaretto on May 17, 2022, 11:06 pm
Our project is pursuing LEED BD+C for Healthcare v4. Under the Minimum Energy Performance prereq, it is stated that the building must comply with the mandatory provisions of ASHRAE 90.1 2010... Last reply: Marcus Sheffer, May 18, 2022, 9:04 am |
|
Wet-applied LubricantsNC-v4 EQc2: Low-emitting materialsposted by Megan White on Sep 18, 2017, 8:11 pm
Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane. Past posts from from v2009 show that "Lubricants" do... Last reply: Ilia Khouri, May 17, 2022, 4:25 pm |
|
Innovation: Design for active occupantsNC-v4 INc1: Innovationposted by Jay R on May 17, 2022, 3:07 pm
Is it mandatory to answer the "Additional Questions" noted in the credit description, or is that optional? Also, Do you recommed uploading a door schedule etc. to show which doors are on... |
|
Number of Floors in Project Space, or Building?Pilot-Credits EQpc117: Quality views in nonregularly occupied spacesposted by JLL Sustainability Consulting on Dec 23, 2020, 2:38 pm
The percentage floor area required to have quality views is dependent on the number of floors in the building. For a CI project, do we count only the number of floors associated with the project... Last reply: Adriana Hansen, May 17, 2022, 2:29 pm |
|
Ventilation strategy in a warehouse projectNC-v4 EQp1: Minimum indoor air quality performanceposted by Santiago Avila on Apr 22, 2022, 3:59 pm
Hi all, We are working on a warehouse project which is implementing a strategy for supplying the outdoor air by using a roof exhaust unit and forcing the supply of OA through the intake... Last reply: Santiago Avila, May 17, 2022, 12:45 pm |
|
Number of Reviews AllowedNC-v4 INc1: Innovationposted by Cindy Quinn on Feb 26, 2021, 2:03 pm
All innovations are now lumped under INc1. If I submit INc1 with a couple strategies in the design preliminary review, and respond to comments in the design final review, will I still be able to... Last reply: Amanda Tullos, May 17, 2022, 11:50 am |
|
Tier 1: On-site renewable energy generation- excluded from LEED BoundaryNC-v4.1 EAc5: Renewable energyposted by A&L SUSTENTABILIDADE on May 17, 2022, 10:55 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5879 thumbs up May 17, 2022- 11:47 am Technically it is Tier 2. Wondering if there is a creative way to draw the project boundary to include it however? That is a question for a different forum I suppose. Log in or register to post comments ... Last reply: Marcus Sheffer, May 17, 2022, 11:47 am |