Log in
Forum
Topic

ASHRAE 62.1-2010

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Andreas Hintz on Apr 18, 2011, 11:47 am

For this prerequisite it is necessary that the ASHRAE Standard 62.1-2007 is met. But what about the newest version ASHRAE Standard 62.1-2010? Does that one count as well?

Thanks for your...

Last reply: Tristan Roberts, Apr 23, 2011, 8:49 pm

Irrigation- Baseline case

NC-2009 WEc1: Water Efficient Landscaping
posted by Maya Karkour on Mar 7, 2011, 11:52 am

Hello,

The guidance is not really clear on what to put in the baseline case. It only says that we need to specify typical landscaping practices.

Do we need to document these...

Last reply: Tristan Roberts, Apr 23, 2011, 6:01 pm

LEED Documentation- is it required for this point

NC-2009 SSc6.2: Stormwater design - quality control
posted by Kelley Howell on Apr 7, 2011, 5:45 pm

Our project approach to this point is pretty straightforward. We are using a water quality...

Last reply: Tristan Roberts, Apr 23, 2011, 5:48 pm

AGMBC 2010- Multi-building industrial plant certification

General forums
posted by Daniel Brum on Apr 10, 2011, 7:11 pm

Hi there. I am working on an industrial plant 2009 LEED-NC/AGMBC 2010 certification. The plant consists of 9 building (the main production building and 8 buildings associated with its normal...

Last reply: Tristan Roberts, Apr 23, 2011, 5:41 pm

LEED CS v3- require actual invoices?

NC-2009 MRc4: Recycled Content
posted by eileen hughes on Apr 19, 2011, 5:39 am

General Contractor has provided LEED submittal material form but the backup information ranges from a job specific letter from the manufacturer, to information from a manufacturer web site. Is...

Last reply: Tristan Roberts, Apr 23, 2011, 4:25 pm

100% recycling rate claims

NC-2009 MRc2: Construction Waste Management
posted by Yancy Wright on Jan 13, 2010, 5:38 pm

I often get reports from recycling facilities taking dedicated loads of concrete,...

Last reply: Tristan Roberts, Apr 23, 2011, 3:52 pm

Minumum sight line height in existing building

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Susan Di Giulio on Mar 17, 2011, 8:56 pm

I think I know the answer to this, but it's not the answer I want, so I'll throw it out there:
I am working on an extensive remodel of a University dorm.The bottom of the existing rough...

Last reply: Tristan Roberts, Apr 23, 2011, 3:48 pm

MRc7 collecting documentation

Schools-2009 MRc7: Certified Wood
posted by Brian Smith on Sep 28, 2010, 10:59 am

Does the value of this credit exclude labor, hardware, delivery when quantifying casework, stackables, etc.

Does the value of this credit include all paper based products, for instance;...

Last reply: Tristan Roberts, Apr 23, 2011, 3:22 pm

FSC Project Certification and Chain of Custody documentation...

Schools-2009 MRc7: Certified Wood
posted by Ward Miller on Apr 18, 2011, 6:49 pm

The General Contractor (...

Last reply: Doug Pierce, AIA, Apr 23, 2011, 1:41 pm

Eligibility of Wood

NC-2009 EAc2: On-Site Renewable Energy
posted by Jens Apel on Apr 20, 2011, 4:03 am

This is a more general question about the eligibility of...

Last reply: Tristan Roberts, Apr 23, 2011, 1:28 pm