Can properly designed rainwater ponds contribute to restored areas?NC-v4.1 SSc2: Protect or Restore Habitatposted by Bryna Dunn on Feb 15, 2024, 12:55 pm
In a project that has both... Last reply: Bryna Dunn, Mar 4, 2024, 1:44 pm |
|
What is the Exact Definition of A Trip?NC-v4 LTc5: Access to quality transitposted by Krithikha Muthukrishnan on Nov 16, 2017, 5:19 am
I am posting this question largely because the credit langauage is not very clear(maybe language nativity issues here). In the Reference Guide, "A Trip" is defined as follows- A trip... Last reply: Shadi Abousamra, Mar 4, 2024, 9:29 am |
|
Preheat coil requirement in baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by Samer Hassanie on Jan 31, 2024, 12:11 pm
Hi, It is not clear from G3.1.3.19 where the preheat coil should be placed. Is it upstream or downstream the economizer and the heat exchanger? Last reply: Samer Hassanie, Mar 4, 2024, 6:50 am |
|
Conflict of InterestNC-v4 EAc1: Enhanced Commissioningposted by Hameed Jasir on Mar 3, 2024, 2:22 am
Good morning.! The owner hired ICA company for design and construction. Would it be acceptable for the contractor to hire the same company for LEED construction stage credit compliance and... |
|
Off-street parking provided is less than minimum required spaces for EV-ready.NC-v4.1 LTc8: Electric Vehiclesposted by Erica Downs on Oct 4, 2023, 6:20 pmThomas Lagarde LEEDuser Basic Member February 29, 2024- 4:47 pm How active is this forum? It seems this didn't get a lot of traction Log in or register to post comments Bryna Dunn Vice... Last reply: Erica Downs, Mar 1, 2024, 10:52 am |
|
No parking for the projectCI-v4 LTc5: Reduced parking footprintposted by Ricardo Sá on Jan 9, 2017, 7:30 am
I understand that LEED v4 CI specifically states that "if there is existing parking associated with the project, it must comply with the requirements of the credit and show a percentage reduction... Last reply: Thomas Lagarde, Feb 29, 2024, 4:51 pm |
|
Better Materials Web Site DiscontinuedNC-v4.1 MRc2: Environmental Product Declarationsposted by Cynthia Kaplan on Feb 5, 2024, 11:06 am
I contacted... Last reply: Allison Para, Feb 29, 2024, 10:50 am |
|
"Everything within the waterproofing membrane"NC-v4.1 EQc2: Low-emitting materialsposted by James Keohane on Jun 24, 2020, 12:14 pm
The credit language states that materials which must meet the requirements are "everything within the waterproofing membrane." The waterproofing membrane itself ( e.g.... Last reply: Adrienne Lynn, Feb 28, 2024, 4:36 pm |
|
Cumulative PointsPilot-Credits WEpc115: Whole Project Water Use Reductionposted by Catarina Costa Goncalves on Dec 6, 2023, 9:41 amfollowing documentation: Whole Project Water Use Reduction calculator, pilot credit registration confirmation, feedback survey, and evidence of participation on the LEEDuser forum to discuss our experience... Last reply: Catarina Costa Goncalves, Feb 27, 2024, 11:36 am |
|
Surface Reflectivity calculations for walls with glazingNC-v4.1 EQc6: Interior lightingposted by Ricardo Sá on Jan 28, 2021, 4:50 am
Dear All, According to LEED credit library, For at least 90% of regularly occupied spaces, use interior finishes with a surface reflectance greater or equal to 80% for ceilings... Last reply: Jamy Bacchus, Feb 26, 2024, 11:40 pm |