Log in
Forum
Topic

Flushout of TI Space

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Carmen Cejudo on Jan 20, 2011, 1:28 pm

I have a building 27,000 sf Office building with a 2,000 sf TI space that will be rented out later. Because the TI space will be a shell, I'm wondering if it needs to be flushed out at the same...

Last reply: Tristan Roberts, Jan 21, 2011, 10:47 am

Demand Control Ventilation

Pilot-Credits PC4: Innovative Ventilation
posted by Peter Dahl on Oct 29, 2010, 5:37 pm

Looks like Pilot Credit 4 is limited to Hospitals and has a very narrow scope.

How about providing an additional Pilot ACP that would test out an Alternative Compliance Path for DCV in EB...

Last reply: Tristan Roberts, Jan 21, 2011, 10:31 am

i guess we don't qualify for credit...

Schools-2009 IEQc6.1: Controllability of systems - lighting
posted by Lisa Logan on Jan 12, 2011, 4:16 pm

the first phase of this project will only be multi-occupant spaces - so the first portion of thecredit can't be met.
can you confirm? is there another option?

Last reply: Tristan Roberts, Jan 21, 2011, 10:09 am

Double Regional Priority Credit

NC-2009 RPc1: Regional Priority
posted by Patrick Keeny on Dec 23, 2010, 8:05 am

If a credit is listed twice in the same zip code for RP credits, is it safe to assume that it counts as two additional points?

For example in Pennsylvania zip code 19103 for Commercial...

Last reply: Tristan Roberts, Jan 21, 2011, 10:08 am

Measurement Protocol

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by LUCY WILLIAMS on Jan 13, 2011, 5:11 pm

Is there any protocol for a scenario where there are two buildings joined by an indoor atrium space? One building prohibits smoking, the LEED project, and the adjacent building does not. There...

Last reply: Tristan Roberts, Jan 21, 2011, 10:07 am

EA P2- ASHRAE 90.1 Compliance & Building Simulation

NC-2009 EAp2: Minimum Energy Performance
posted by Rodrigo Perez on Nov 24, 2010, 10:56 am

We’re working on a two stories building that is seeking LEED NC v3 certification. This building considers two vegetal strategies on its design.
1. The first one is a deciduous vineclimb...

Last reply: Marcus Sheffer, Jan 21, 2011, 10:03 am

NGV

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Carolina Vergnano on Jan 20, 2011, 8:22 am

In oder to comply with this credit, coud I consider every vehicle that uses natural gas, even though the NG is a limited natural resource?

Last reply: Tristan Roberts, Jan 21, 2011, 10:03 am

Certification Period and Installation Date/Period of Manufacture

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Lauren Sparandara on Jan 19, 2011, 2:40 pm

This may have already been addressed. If so, my apologies.

Basically, I am working on a dorm that has installed their furniture 6 months or so ago but is finalizing their LEED...

Last reply: Josh Jacobs, Jan 21, 2011, 9:36 am

Basement system for Baseline Building

CS-2009 EAc1: Optimize Energy Performance
posted by heinrich post on Jan 21, 2011, 2:37 am

we are modeling an eQUEST model for LEED.
The designed building is a scyscraper building with FC systems for office use.
For the Baseline model we selected a...

Last reply: Marcus Sheffer, Jan 21, 2011, 9:25 am

Separate Spreadsheet

EBOM-2009 MRc5: Sustainable purchasing - food
posted by Richard Navarro on Jan 13, 2011, 5:50 pm

Hi,

I just received my comments back from my project, and they are telling me that I need to input all the information into their LEED Online spreadsheet. I normally wouldn't have a...

Last reply: Tristan Roberts, Jan 21, 2011, 9:16 am