I have a building 27,000 sf Office building with a 2,000 sf TI space that will be rented out later. Because the TI space will be a shell, I'm wondering if it needs to be flushed out at the same time as the rest of the building, and then again once the finishes are installed by the tenant. It seems like this is someting that would go in the Tenenat Guidelines, but we've been dinged for not including this space in other credits (WE, EA) since LEED is a whole building certification. Does anyone have any experience complying with this credit for TI spaces?