Topic | Recent |
---|---|
Parking and Data center included?EBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Ricardo Sobral on Feb 20, 2011, 2:46 pm
Our project includes one Data Center and a parking space. Both spaces are not regularly occupied, according to ASHRAE 62.1-2007 glossary (they are "only occupied occasionally and for short... Last reply: Tristan Roberts, Feb 23, 2011, 8:41 pm |
|
FTE to SS 3.2 LEED CI caseCI-2009 SSc3.2: Alternative transportation - bicycle storage and changing roomsposted by Paola Figueiredo, Newton Figueiredo on Feb 22, 2011, 4:58 pm
How can I proceed with the credit SS 3.2 for a LEED CI v2.0, when the Tenant... Last reply: Tristan Roberts, Feb 23, 2011, 8:34 pm |
|
Calculating a DomeNC-2009 SSc7.2: Heat island effect - roofposted by Norma Lehman on Feb 22, 2011, 10:48 pm
We have a roof that consists of a flat roof with a dome. Last reply: Tristan Roberts, Feb 23, 2011, 8:00 pm |
|
Case 2 of SSc5.2NC-2009 SSc5.2: Site development - maximize open spaceposted by Mike Phelps on Feb 15, 2011, 11:28 am
The language for this case specifies open vegetated space "adjacent" to the building. Does adjacent mean next to the building or can it be vegetated open space near to the building as well? Also... Last reply: Tristan Roberts, Feb 23, 2011, 7:29 pm |
|
portfolio manager space designationEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on Sep 2, 2010, 11:25 pm
My client's building is predominantly an office building. We have defined other space functions (cafeteria, toilets, meeting rooms, retail spaces, etc) in the Project Info forms. However, the... Last reply: Tristan Roberts, Feb 23, 2011, 6:46 pm |
|
Growth and ErosionCS-2009 IEQp1: Minimum indoor air quality performanceposted by Adriana Hansen on Feb 9, 2011, 2:43 pm
We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1? Last reply: Tristan Roberts, Feb 23, 2011, 6:35 pm |
|
Service Hot Water Efficiency Proposed vs. BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Paul Bohres on Feb 22, 2011, 5:29 pm
How do you account for the difference in service hot water efficiency from the proposed design to the baseline design if the proposed design is using electric point-of-use water heaters? Is... Last reply: David Hubka, Feb 23, 2011, 1:56 pm |
|
For my Non US projec the RPsGeneral forumsposted by Nelina Loiselle on Feb 23, 2011, 12:00 pm
For my Non US projec the RPs show up under the "Add or Remove" credit tab, but on my scorecard they do not show up and I do not get the extra point. Any idea on what to do in order to get the... Last reply: Susann Geithner, Feb 23, 2011, 1:26 pm |
|
Overlit spaces, IEQc8.1NC-2009 IEQc8.1: Daylight and views - daylightposted by Sarah Corbitt on Feb 14, 2011, 2:05 pm
Hi, I've got a 9,400 SF building which serves as the offices for the athletic faculty at a small public university. Two of the offices, both facing north, are overlit when calculated with the... Last reply: Brian Baewon Koh, Feb 22, 2011, 10:30 pm |
|
Wood nailer on mechanical curbs to be included in FSC calc?NC-2009 MRc7: Certified Woodposted by David Hubka on Feb 21, 2011, 11:57 am
Is it required to submit the info on the... Last reply: Doug Pierce, AIA, Feb 22, 2011, 3:28 pm |