How can I proceed with the credit SS 3.2 for a LEED CI v2.0, when the Tenant FTE exceed the number of FTE default calculation (total sf/250sf) for the Certified Core and Shell v2.2 Building, which this CI occupies? The CS building FTE results in 1298 when the tenant are reating about 12 floors with a FTE of 1760.

Can I persue the SS 3.2 for this LEED CI case, considering the inability to install more racks at the building?

Thanks