Grid Harmonization- Case 3: Load Flexibility and management strategiesLEED v4.1 Discussion Forumposted by Caterina Panteghini on Apr 12, 2023, 9:27 am
Hi, Case 3 refers to a regional grid load profile... |
|
Zero Lot Line with required streetscapeNC-v4.1 MPR2: Must use reasonable LEED boundariesposted by Elena Khoury on Apr 11, 2023, 11:42 am
Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/... |
|
Mechanical Ventilation in a WarehouseNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Dec 5, 2017, 5:49 am
Hello, Maybe this question has already been done, and many times, but can´t find it. I am modeling a Warehouse which is not conditoned nor heated. It has intake fans to comply with... Last reply: Marcus Sheffer, Apr 11, 2023, 10:18 am |
|
Chilled Water for Process CoolingNC-v4.1 EAp2: Minimum Energy Performanceposted by Antonio Cajas on Apr 10, 2023, 8:32 pm
Hello everyone, I have a project for a warehouse, in which there are areas for storage and manufacturing of plastics. For the air conditioning system, two water cooled chillers are used.... Last reply: Marcus Sheffer, Apr 11, 2023, 10:15 am |
|
Zero Lot Line with required streetscape?NC-v4.1 LTc6: Bicycle facilitiesposted by Elena Khoury on Apr 10, 2023, 6:41 pm
Can streetscape can be excluded from a project boundary if it's required by municipality? For context, there's civil and landscape work that's occuring in front of my project that is required/... |
|
Baseline Lighting ControlCI-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Apr 5, 2023, 4:01 pm
I am modeling a space which has some spaces which have area greater than 250 ft2, now this is an office space and using building area method... Last reply: Marcus Sheffer, Apr 10, 2023, 4:35 pm |
|
Imported material with EPDNC-v4.1 MRc2: Environmental Product Declarationsposted by Gustavo De las Heras Izquierdo on Jan 13, 2023, 12:56 pm
Hello, We have received the following review comment:
Last reply: Ahmed Abd El Fattah, Apr 10, 2023, 11:58 am |
|
Building LCA analysisNC-v4 MRc1: Building life-cycle impact reductionposted by Ahmed Abd El Fattah on Apr 8, 2023, 3:51 am
Hello Would changing the structural materials from Steel to concrete or the other way count in LCA, given that both options have valid structural designs? Last reply: Ahmed Abd El Fattah, Apr 9, 2023, 9:54 pm |
|
Demand Response for Residential buildingsNC-v4 EAc4: Demand responseposted by Amanda Cunningham on Nov 30, 2022, 9:40 am
Has anyone pursued this credit for a multifamily building? I'm assuming the automated... Last reply: Justin Southwick, Apr 7, 2023, 11:10 pm |
|
Grout RequirementsCI-v4 EQc2: Low-emitting materialsposted by Michelle Rosenberger on Feb 12, 2018, 4:40 pm
Does grout still need to meet low emitting requirements? If so, both... Last reply: Stacey Olson, Apr 7, 2023, 3:09 pm |