Topic | Recent |
---|---|
LEED Water Side Calculator for DES1NC-v4 EAp2: Minimum Energy Performanceposted by elvin ruya on Sep 12, 2024, 5:06 pm
Hi, I was wondering if anyone knows the requirements for the secondary pump controls under the... Last reply: Tyler Thumma, Sep 19, 2024, 8:24 am |
|
REACH OptimizationNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Sandra Moran on Jan 23, 2018, 9:52 am
Project is N America (outside USA). Manufacturer is Europe HQ with global operations; uses European standards for global manufacturing. Materials will be produced in USA/ shipped to project... Last reply: Josef Andersen, Sep 19, 2024, 5:33 am |
|
Excluding spaces from the project's LEED BoundaryCI-v4 MPR2: Must use reasonable LEED boundariesposted by Nadia Azzam on May 18, 2023, 4:34 pm
Hello, We are currently designing office space that will occupy a portion of the 1st level and the entire 3rd level of a building, with a staircase connecting the... Last reply: Andrey Kuznetsov, Sep 18, 2024, 10:42 pm |
|
Building reuse plus additionNC-v4.1 MRc1: Building life-cycle impact reductionposted by Erica Downs on Sep 1, 2021, 5:34 pm
Can someone please clarify if the entire project (including additions) is used as the "denominator" for this credit? Or only the existing building that is being resused? I am finding the credit... Last reply: Lorax Partnerships, Sep 18, 2024, 4:31 pm |
|
LEED Online SubmissionPilot-Credits WEpc115: Whole Project Water Use Reductionposted by Katherine Tich on Jul 29, 2024, 10:42 am
We are finalizing our documentation for this ACP, and want to make sure we upload to the correct location. In others' experience, what documentation pathway has been approved? It is our... Last reply: Gerardo Trejo, Sep 18, 2024, 12:35 pm |
|
Reheating more than 30% at the VAVNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Sep 17, 2024, 12:29 pm
I am becoming involved with a project that is being designed to reheat more than 30% of the max cooling airflow rate at the... Last reply: Dave Hubka, Sep 18, 2024, 11:28 am |
|
What Documentation- Specs or Submittals? Cadmium and Lead Paint still an issue for NEW Paint?Healthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Heather Ane Zeto on Sep 18, 2024, 10:18 am
2 questions in 1!
|
|
Laboratory Spaces baseline system in warm climate and proposed building is electrified heatingNC-v4.1 EAp2: Minimum Energy Performanceposted by Russell Knudson on Sep 17, 2024, 5:08 pm
For a project within warm Climate Zones 0 to 3A, and that has a "metal shop" space that requires more than 15,000 CFM, is it a correct reading that the baseline system serving those spaces shall... |
|
Clubhouse Building Type? Public Assembly or Non-Residential?NC-v4.1 EAc2: Optimize Energy Performanceposted by Junaid Mujahid on Sep 3, 2024, 1:47 am
A clubhouse project with amenities including: Gymnasium, Yoga/Aerobic Studios, Party Hall, Dining Hall, Lounge, Small Retail Stores, Prayer Rooms, Basement Parking should be categorised under... Last reply: Junaid Mujahid, Sep 18, 2024, 4:00 am |
|
Clarification Needed on Reporting Bus TripsNC-v4.1 LTc5: Access to quality transitposted by on Sep 17, 2024, 1:12 pm
I’m seeking clarification on a matter related to daily trip reporting for our local transit system. We have multiple buses running simultaneously on certain routes. For instance, the local Route... Last reply: Andrey Kuznetsov, Sep 18, 2024, 2:50 am |