Log in
Forum
Topic

Design Flow Rate higher than Baseline

NC-v4.1 WEp2: Indoor water use reduction
posted by Talia Mamayek on Nov 15, 2024, 3:30 pm

Hi,

I am working on a residential project that has bathrooms in an amenity space and spa. I believe these are classified as public lavatory (restroom) faucets with a baseline of 0.5 gpm....

Last reply: emily reese moody, Nov 15, 2024, 3:50 pm

Worksheet as helpful tool

Pilot-Credits IPpc93: Prevention through design
posted by Greg Romanczyk on Feb 26, 2018, 10:55 am

We found the PtD worksheet to be a helpful tool during Design and Construction process reviews. Our project is a University project, where the Safety + Health Mission of the University aligned...

Last reply: EST220910BF6 ESTIMPAC SAS DE CV, Nov 13, 2024, 11:28 am

Opt 2. Waste Prevention

NC-v4.1 MRc5: Construction and demolition waste management
posted by Dave Hubka on Apr 5, 2022, 11:41 am

If a project pursues Option 2 - Waste Prevention is it required to track disposal and diversion rates of the project?

odd that...

Last reply: Dave Hubka, Nov 13, 2024, 7:28 am

Submitting Minimum Energy Performance Data for Multiple Buildings in LEED Campus Group Approach

CS-v4 EAp2: Minimum Energy Performance
posted by Alvaro Twose on Nov 12, 2024, 7:25 am

Hello LEED colleagues,

I'm working on a Core & Shell project with multiple buildings under LEED Campus following the Group Approach. I've encountered a challenge when submitting the...

Last reply: Marcus Sheffer, Nov 12, 2024, 1:08 pm

regularly occupied areas

NC-2009 IEQc8.2: Daylight and views - views
posted by Ed Clark on May 9, 2011, 1:39 pm

I am trying to confirm what is considered a regularly occupied area:

copy room?
storage room?
mechanical rooms?
conference rooms?

Last reply: Alefiya Bhiwandiwala, Nov 12, 2024, 3:03 am

Do Daylight and Views Credits Require the Same Regularly Occupied Space?

Warehouses-NC-v4 EQc7: Daylight
posted by Alefiya Bhiwandiwala on Nov 12, 2024, 2:41 am

I have a question about a project with a core production/...

LEED v4.1 Service water-heating system with DES purchased heat

Hospitality-NC-v4.1 EAp2: Minimum Energy Performance
posted by Manuel Romera Molina on Nov 11, 2024, 4:01 am

Hello everybody,

Regarding the Baseline Service Water-Heating System, both Table G3.1.1-2 in Standard 90.1 - 2016, as well as the statements in Table 3 "Changes in ASHRAE 90.1 Performance...

How to Model Proposed and Baseline HVAC system for a District level heating and Cooling system

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm

Hi, 

I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a...

Last reply: Manuel Romera Molina, Nov 11, 2024, 2:53 am

Designated Smoking areas inside the building

EBOM-v4 EQp2: Environmental tobacco smoke control
posted by Amal Venugopal on Sep 3, 2020, 8:16 am

Hi , I m looking for a  clarification on alternative compliance path for complying the prerequisite Environmental Tobacco Smoke Control under LEED v4 O M rating system. The project is a high rise...

Last reply: sahar elfaki, Nov 10, 2024, 1:08 am

Baseline and Proposed System for LEED ID+C

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Nov 4, 2024, 12:00 pm

Hi I am working on a LEED ID+C project for a building that was built in 1970s with 60% WWR, now the struggle here is the Existing system is Dual Duct...

Last reply: Tyler Thumma, Nov 8, 2024, 8:24 am