Topic | Recent |
---|---|
Arbitrage optionCS-v4 EAc5: Renewable energy productionposted by Glen Boldt on May 17, 2024, 7:09 pm
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form? Within the USA, do they need to be purchsed from a renewable... Last reply: Marcus Sheffer, May 17, 2024, 7:35 pm |
|
WEpc115 calculatorPilot-Credits WEpc115: Whole Project Water Use Reductionposted by Clive Lacey on Feb 22, 2024, 4:18 pm
Hi all, Does anyone know the procedure for calculating the Baseline for "process load" and "HVAC" in the WEpc115 calculator? Last reply: Marelle Davey, May 17, 2024, 5:54 pm |
|
Emmissions factor sources should be specifiedLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by Caroline Quinn on May 17, 2024, 3:44 pm
Recommend that in accordance with... |
|
LEED v5: O+M- Public CommentsLEED v5 O&M Existing Buildings Public Commentsposted by Kelly Mehring on May 17, 2024, 4:08 pm
Credit: Operational Planning and Response for Resilience The credit states to '... |
|
Social Equity Assessment: Would be good to reference the Building EJ Toolkit as a resource for the socialLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by simon fowell on May 17, 2024, 2:52 pm
I would recommend referencing the Building EJ Tool (https://www.ejtoolkit.com/) in this credit as a tool for project teams to more-easily complete the... |
|
Regional MaterialsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Sarah B Gregg on May 17, 2024, 1:57 pm
Consider adding an option to reward the use of locally sourced materials. I understand previous variations of this type of credit have been quite difficult to achieve since most building... |
|
LEED and complex factors BPF, PI, PIt, BBUEC, BBREC- Could be more accessible for everyone.LEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Alex Edwards on May 17, 2024, 1:31 pm
At the upcoming SimBuild event, an intriguing presentation awaits: ‘I’m speaking at the #SimBuild 2024 Conference in Denver, discussing ASHRAE 90.1’s Building Performance Factors. I hope to... |
|
What consultants are included in a design contract?Pilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Rebecca Holt on May 17, 2024, 12:27 pm
Can anyone confirm what consultants should be included in the design contract? In a typical prime consultant contract, there are subconsulting disciplines which we assume would be part of the... |
|
Operational Carbon Projection and Decarbonization Plan + ElecrificationLEED v5 BD+C/ID+C: Energy and Atmosphere Public Commentsposted by Emily Purcell on Apr 26, 2024, 2:53 pm
How do projects on combustion-fueled district energy systems approach this prereq & credit? Many campus projects with a central plant are now being designed to use no fossil fuel on... Last reply: Riley McKillop, May 17, 2024, 11:08 am |
|
LEED v5 BD+C/ID+C: CSC and structural building productsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Carsten Rieck on May 17, 2024, 10:40 am
The certification according to the Concrete Sustainability Council (CSC) should be considered in version 5. CSC aims to promote responsible sourcing and production of concrete, cement and... |