Log in
Forum
Topic

Variable Speed Fan Coil Unit

NC-2009 EAc1: Optimize Energy Performance
posted by James Chueh on Nov 15, 2011, 2:22 am

There are more and more companies making fan coil units with...

Last reply: Marcus Sheffer, Nov 16, 2011, 8:59 am

Common dumpsters for overlapping CS and CI projects- same GC

CI-2009 MRc2: Construction Waste Management
posted by kathy zarsky on Apr 8, 2010, 2:05 pm

I have a situation not too unlike the first question raised above. I have a core and shell project and a CI project within same building whose schedules overlap. Valerie Walsh's response is...

Last reply: Maria Porter, Nov 16, 2011, 8:31 am

Epoxy floor coating

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Jana Schulz on Aug 23, 2010, 7:11 pm

Do you know what are the requirements to meet if I have an epoxy floor in my project? Thanks!

Last reply: Petra Hajná, Nov 16, 2011, 8:00 am

Cancellation due to inactivity

General forums
posted by Agustina Galli on Nov 9, 2011, 4:13 pm

Hello!
does anybody know where are the cancellation policies for projects? in the Certification Policy Manual says
"12.3 Cancellation Due To Inactivity: Subsequent to registering a...

Last reply: Emily Catacchio, Nov 15, 2011, 8:39 pm

IAQ managent- real live pictures

CI-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Susann Geithner on Nov 15, 2011, 5:48 pm

Here are some real live applications for...

UNUSUAL AND UNIQUE PROCESS LOAD

NC-2009 EAp2: Minimum Energy Performance
posted by Vindio Corro on Nov 15, 2011, 1:51 pm

We are working in a Project which is a unique green energy research facility (the second to be built in the World), and must receive the LEED Silver standard complying with the South Carolina...

Last reply: Marcus Sheffer, Nov 15, 2011, 2:25 pm

PC 34- Design for Adaptability

Pilot-Credits PC34: Design for Adaptability
posted by albert kovacik on Nov 15, 2011, 2:01 pm

We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt...

PC 29- Housing & Job Proximity

Pilot-Credits PC29: Housing and Jobs Proximity
posted by albert kovacik on Nov 15, 2011, 1:36 pm

We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt...

75% COMPLIANCE area

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Danna Sigal on Aug 30, 2010, 4:36 pm

Our roof is 100% covered with White EPDM material. On top of that material are the HVAC units. There are also a couple of vents and a hatch opening for roof access. All these things add up to...

Last reply: Tristan Roberts, Nov 15, 2011, 1:20 pm

Cumulative Facade Intrusion?

Pilot-Credits PC14: Walkable Streets
posted by Kimberly Frith on Sep 16, 2011, 3:36 pm

Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade. One of the facades has 54 feet of blank length, while...

Last reply: Chris Marshall, Nov 15, 2011, 12:38 pm