Topic | Recent |
---|---|
CI for a residential homeLEED Rating System Selectionposted by Emmanuel Pauwels on Dec 21, 2011, 11:35 am
We are evaluating an international (non-US) project that would like to build 2 separate buildings on one single site. One building is a hotel which measures 50.000 ft2 and the second building is... Last reply: Tristan Roberts, Dec 27, 2011, 3:55 pm |
|
Pilot CreditPilot-Credits EApc3: Medical and process equipment efficiencyposted by Dan Forino on Dec 23, 2011, 11:06 am
If we have a LEED Project that was pursuing a Pilot Credit but without knowing that it was a Pilot Credit, and are at the Submission Phase can we still apply for this credit. Basically the Owner... Last reply: Marcus Sheffer, Dec 27, 2011, 12:04 pm |
|
Interior Lighting_24-hour operation projectNC-2009 SSc8: Light Pollution Reductionposted by Seunghyun Cha on Dec 26, 2011, 8:40 pm
Hi, |
|
Pilot Credit 9Pilot-Credits PC9: Street Networkposted by Jeffrey Lewis on Dec 22, 2011, 2:42 pm
I'm not sure why this point is necessary, to be completely honest. LEED already has community connectivity points to show neighborhood walkability, mass transit points to further show a minimized... |
|
LCA and Renovating an Existing BuildingPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dana Murdoch on Sep 30, 2011, 11:15 am
I am considering using this pilot credit for a renovation project of a residence hall. Does anyone have an opinion if this would make sense? Some background - The residence hall is going... Last reply: Sara Goenner Curlee, Dec 22, 2011, 12:34 pm |
|
I'm working on finalizingCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Heather Anderson on Dec 21, 2011, 4:04 pm
I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings. However, all the installed ballast are dimmable and all... Last reply: Dane Sanders, Dec 21, 2011, 7:17 pm |
|
If you are registered forGeneral forumsposted by Francis Chua on Dec 21, 2011, 4:26 pm
If you are registered for LEED v2.2, then you must follow AGMBC, 2005. As you mentioned, all 4 buildings must independently meet the requirements for the EQ credits. For the 2 buildings that are... |
|
Rec CenterNC-2009 IEQc6.1: Controllability of systems - lightingposted by Meredith Hunt on Jan 26, 2011, 4:58 pm
I am working on a potential recreation center and am a little confused on how individual controls would work in a space like this. The majority of the building is a big open space with 4... Last reply: Lauren Sparandara, Dec 21, 2011, 3:35 pm |
|
Shower FTE QuestionCI-2009 SSc3.2: Alternative transportation - bicycle storage and changing roomsposted by JENNIFER COMEAU on Dec 21, 2011, 1:41 pm
Our tenant has purchased a bike rack just for their suite, and appropriate signage has been installed. When working on the credit template, I am able to input the # of secure bike racks and the... Last reply: JENNIFER COMEAU, Dec 21, 2011, 2:19 pm |
|
Multiple buildings including residentialLEED Guidance for Campuses and Multiple Buildingsposted by Emmanuel Pauwels on Oct 25, 2011, 8:02 am
We would like to use the multiple buildings approach for an international project that includes a site with a hotel and one residential single family home which belongs to the owner of the hotel... Last reply: Emmanuel Pauwels, Dec 21, 2011, 12:02 pm |