Option 4 has disappeared from the May 2011 Addenda

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Deborah Lucking on Jun 24, 2011, 2:06 pm

Option 4, citing the ITE study is not shown in the May 2011 Addenda. Does anyone know if this was just an omission by mistake, or is this Option no longer valid? It was in the July 2010 Addenda...

Last reply: David Posada, Aug 23, 2011, 1:50 pm

other related green practices

EBOM-2009 MRp2: Solid Waste Management Policy
posted by Pablo Fortunato Suarez on Jul 5, 2010, 8:34 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 12, 2010- 9:08 pm Your similar question is answered on the MRp1 forum. It's fine to amend the existing policy to meet the LEED targets. You will need to be in compliance for the performance period—the existing non-compliant policy won't work in this case. Log in or register to post comments Pablo Fortunato Suarez Principal ESD Consultant/Architect GreenArc Sustainable Building & Architecture LEEDuser Basic Member 253 thumbs up July 14, 2010- 5:28 am Thank you Tristan. The client actually...

Last reply: Jessica Hawley, Aug 23, 2011, 10:35 am

Is SS c7.2 actually a Construction Credit?

NC-2009 SSc7.2: Heat island effect - roof
posted by Kim Shinn on Apr 22, 2010, 5:56 pm

During design review, request for additional information on actual installed materials.

I upload the specification section showing requirement for...

Last reply: Susann Geithner, Aug 23, 2011, 9:51 am

Parking garage under building

NC-2009 SSc7.1: Heat island effect - nonroof
posted by AshLee Eustace on Aug 2, 2011, 5:29 pm

I have a building with the first two floors are made up of a parking garage, and the floors above are condominiums. For this credit, does the...

Last reply: Jean Marais, Aug 23, 2011, 2:58 am

100 ft wetlands setback

CS-2009 SSc1: Site Selection
posted by Ben Tucker on Aug 22, 2011, 9:37 am

Our site is previously developed and we will be performing a major renovation on the existing building. We appear to meet all the criteria for this credit with the exception perhaps of the...

Last reply: Susann Geithner, Aug 22, 2011, 5:30 pm

Avoidance of Chemicals of Concern in Building Material

General forums
posted by Tom Lent on Aug 1, 2011, 1:54 pm

I'm very pleased to see this credit (the last one in Table 2 above) added to the mix. I think it represents an important advance for the LEED system in bringing healthy materials to building...

Last reply: Anne Less, Aug 22, 2011, 5:29 pm

Laboratories

CI-2009 WEp1: Water Use Reduction
posted by Jennifer Berthelot-Jelovic on Aug 2, 2011, 4:15 pm

Is it safe to assume that faucets that are installed in labs are not included in the water fixture calculations since they are not listed in the reference guide? We of course have included all of...

Last reply: Dave Intner, Aug 22, 2011, 3:57 pm

# Of Testing Locations

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Dan Forino on Aug 12, 2011, 10:38 am

Our project single floor mixed use space, with a large single heat recovery unit providing outside air to all of the spaces. Additionally there are 17 plenum return heat pumps located throughout...

Last reply: Dan Forino, Aug 22, 2011, 3:33 pm

Interactive Compliance Forms.

CI-2009 EAp2: Minimum Energy Performance
posted by elizabeth warlop on Aug 22, 2011, 12:51 pm

If I am not altering the HVAC, Or Building Envelope, or Service Water, Do I have to fill out the Interactive Compliance Forms, ie the Building Envelope, the HVAC Compliance the Service Hot water...

LEED HC and NC at the same time

General forums
posted by Joshua ADY on Aug 22, 2011, 4:40 am

Kindly clarify if a Hospital Project would be allowed to pursue both LEED NC and LEED HC simultaneously .

Last reply: Sara Cederberg, Aug 22, 2011, 9:41 am