Log in

4026 search results for "zero lot line"

Forum
Topic

Baseline hot water generation

NC-2009 EAp2: Minimum Energy Performance
posted by Ciaran McCabe on Mar 2, 2016, 6:48 am

pump" is the same formula as for a small electric water heater. This is a bit confusing. The bottom line is that if you have a heat pump water heater in the proposed the baseline efficiency is calculated...

Last reply: Eva Denton, Jan 9, 2020, 6:10 am

EAc3- Enhanced Commissioning, LEED v2009

NC-2009 EAc3: Enhanced Commissioning
posted by Jared Reed on Apr 22, 2016, 1:50 pm

and normally I would include a little bit to cover increasing salaries and costs, but not a lot. You are only contracting for the design, but then when you come back to the firm for the construction within...

Last reply: Scott Bowman, May 2, 2016, 11:37 am

Reduce Parking Footprint

NC-v4 LTc7: Reduced parking footprint
posted by Hadar Farjo on Sep 22, 2016, 3:06 pm

LT Credit: Reduced parking Foot print Can this credit be achieved if there are no parking spaces provided and we are using existing parking lot for the new building? LTc7 United States ...

Last reply: Milo Aguilar, Nov 2, 2023, 3:28 pm

Untenanted spaces with no lease agreements

CS-2009 IEQp1: Minimum indoor air quality performance
posted by John Mader on Jun 29, 2016, 3:53 am

through this a lot with C&S projects with no identified tenants. The reviewers have been very focused on this lease issue of late. The guidance we have received is as follows: "A binding Lease...

Last reply: John Mader, Jul 4, 2016, 10:55 pm

LEED interpretation ID # 10235

NC-v4 SSc5: Heat Island Reduction
posted by Juan Carlos Contreras on Nov 5, 2016, 9:05 pm

for the "Total project roof area" line. Log in or register to post comments Olga Yuil Green Building Consultant LEEDuser Basic Member 20 thumbs up June 28, 2018- 3:17 pm Thank you Emily. Log in or register...

Last reply: Olga Yuil, Jun 28, 2018, 3:17 pm

NFRC Rated Fenestration

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Nov 6, 2016, 5:19 am

the actual frame size for each window. it would complicate the model a lot because each window would have different U-factor and SHGC. but it would not be the case if NFRC 100 and 200 refer to standard frame...

Last reply: Marcus Sheffer, Nov 7, 2016, 10:50 am

Envelope Cx- whole-building air leakage testing

NC-v4 EAc1: Enhanced Commissioning
posted by Julien Richard on Nov 22, 2016, 8:25 am

on this but there is a confirmation of this LI in the guide and it is listed as a "special circumstance". What if after the LI this was published as an addendum to the guide, which can modify the standard? I use the on-line...

Last reply: Marcus Sheffer, Jan 28, 2019, 10:11 am

Exemplary Performance for No Parking

NC-v4 LTc7: Reduced parking footprint
posted by Risto Beatty on Nov 22, 2016, 9:37 am

that provide no off-street parking can earn exemplary performance so long as the base parking ratio is greater than zero. If you have this situation you might have to 'force' the ID credit, as the base...

Last reply: Marilyn Specht, Aug 21, 2017, 2:06 pm

French VOC emission labeling

NC-v4 EQc2: Low-emitting materials
posted by FABIO VIERO on Dec 13, 2016, 1:44 pm

Reinhard Oppl Independent consultant on VOC issues formerly with Eurofins Product Testing A/S LEEDuser Basic Member 329 thumbs up December 15, 2016- 10:04 am Elodie, I agree that there is a lot of confusion...

Last reply: Michelle Halle Stern, Dec 15, 2016, 11:45 am

Solar Panels

NC-2009 EAc2: On-Site Renewable Energy
posted by Paula Hernandez on Jan 9, 2017, 8:35 am

the interpretation to for one owner with nine LEED projects and six different renewables locations. All of the project ended up as Zero Net Energy Use as well as Zero Net Energy Cost. Five of those earned LEED...

Last reply: Marcus Sheffer, Feb 16, 2021, 5:09 pm