Vegetated buffer space qualifying as accessible space?NC-v4 SSc3: Open spaceposted by Chris Flint Chatto on Mar 23, 2023, 3:55 pmthen that too could be considered to be compliant outdoor space. To keep it simple: A walking path around a parking lot and building footprint, then just the walking path is compliant outdoor space. A walking... Last reply: Dave Hubka, Mar 24, 2023, 7:46 am |
|
Any success with this credit yet?Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Sophie Kerr on Oct 29, 2018, 4:11 pmare using Autocase to document Triple Bottom Line Analysis on a new construction residence hall. I had been wanting to pursue this credit for multiple projects. However, this is the first where the Owner... Last reply: Rachael Johnson, Mar 20, 2023, 1:05 pm |
|
Entire floor area counts if at least 75% has a view?NC-v4 EQc8: Quality Viewsposted by Martha Norbeck on Mar 15, 2023, 10:55 pm"For private office, the entire square footage of the office may be counted if 75% or more of the area has a direct line of sight to perimeter vision glazing. For classrooms and other multi-occupant spaces, the actual square footage with a direct line of sight to perimeter vision glazing is counted." Under v4, I no longer see that same allowance. Can you please clarify if we are only allowed... Last reply: Gustavo De las Heras Izquierdo, Mar 16, 2023, 11:52 am |
|
More challenging than anticipatedPilot-Credits IPpc93: Prevention through designposted by Megan Leslie on Dec 6, 2018, 1:36 pmas a whole for each area/type where you were able to make changes. Splitting it up into different sections leads to a lot of repetition and a clunky narrative. Thanks, glad I'm not the only one who found... Last reply: Stacey Flint, Mar 16, 2023, 11:51 am |
|
Modeling a District Energy PlantNC-2009 EAc1: Optimize Energy Performanceposted by Jason Files on Sep 23, 2010, 3:27 pmAlso, if the chiller equipment must be downstream and included in the model what do you use for the base line? Can you use standard efficiency air cooled equipment? Thanks in advance for any assistance!... Last reply: Cory Duggin, Mar 14, 2023, 11:47 am |
|
Plug loads for server roomsNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 22, 2015, 4:39 pmhttp://www.energyrating.gov.au/wp-content/uploads/Energy_Rating_Document......alternatively ASHRAE Journal Feb 2013, Internal IT Load Profile Variability = 538 to 2153 W/m2 for Data Centers and 108 to 161 W/m2 for offices Bottom line is that ASHRAE 90.1-2007 does not regulate what you... Last reply: Jean Marais, Mar 14, 2023, 4:39 am |
|
BUG Method ClarificarionNC-v4 SSc6: Light Pollution Reductionposted by Mankisha Veng Veng on Mar 17, 2022, 10:56 amto U2 If mounted on top of wall, Limit backlight to B0. Orient fixture so the "back" faces the property line. Limit glare to G2 if on top of the wall. Or G0 if on outside face of wall. Select... Last reply: Glenn Heinmiller, Mar 8, 2023, 12:47 pm |
|
Project is not required to simulate baseline in 4 orientationsNC-v4 EAp2: Minimum Energy Performanceposted by Michael on Feb 16, 2023, 2:57 amI would like to understand the line: the project is not required to simulate 4 baseline orientations because the building orientation is dictated by the site consideration. What does "Site Consideration" mean in this context? Does it mean when the site is small and the building takes most of the site area, then we don't rotate the baseline model? If the building is small compared to the site area (there is big empty land around the building that allows the building to rotate), then we have to rotate the baseline model in 4 orientations? Thanks for your insights. EAp2 ... Last reply: Marcus Sheffer, Mar 7, 2023, 10:07 am |
|
LEED C&S- No Landscaping in ScopeCS-v4.1 WEp1: Outdoor water use reductionposted by Levi Jimenez on Mar 1, 2023, 6:21 pmDave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 530 thumbs up March 1, 2023- 11:39 pm Hello Levi, We had a similar project in which the building/site were owner occupied. The existing site had an existing irrigation system still in use. But since the scope of work was only interior and base building components we took the project through a LEED CI certification. This rating system does not include an Outdoor Water Use Reduction prereq or credit. For BD+C projects the ref guide states "projects may not enter zero water requirements for any landscaped areas". So my guess... Last reply: Levi Jimenez, Mar 2, 2023, 9:12 am |
|
Retail service toilets thermal zoneNC-v4 EAp2: Minimum Energy Performanceposted by Julio Fernandez Amodia on Feb 22, 2023, 12:48 pmand also forums such as unmethours. But at the end of the day, a lot of times is about a judgment call, and keeping things fair between baseline and proposed models, so you can have an apples to apples... Last reply: Julio Fernandez Amodia, Feb 27, 2023, 10:32 am |