How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use > 20%?

Warehouses-NC-v4 WEp2: Indoor water use reduction
posted by Blake Jackson on Dec 1, 2023, 2:44 pm

does not have any applicable fixtures. My second thought of potential is more along the lines of the Interiors project approach, where your Prereq and Credit calcs would be based on the existing fixtures...

Last reply: emily reese moody, Feb 3, 2024, 1:22 pm

Initial Water Storage

NC-v4 SSc1: Site assessment
posted by JIm Rozema on Aug 24, 2018, 11:38 am

Member February 2, 2024- 5:50 pm Well that helps a lot, thanks Log in or register to post comments ...

Last reply: Thomas Lagarde, Feb 2, 2024, 5:50 pm

Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?

NC-v4.1 LTc5: Access to quality transit
posted by Zabdi Valdez on Mar 14, 2023, 6:01 pm

I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an internal shuttle that transports people from that main entrace to their specific buildings. The question is, can we be awarded the points for all of the buildings individually by using that main controlled access for all of them, while also having an internal private shuttle for their internal transportation needs? Thanks a lot! LTc5 Brazil ...

Last reply: David O'Connell, Jan 31, 2024, 4:25 am

v4.1 EPD Option 2 (optimization)- no viable way to mandate this in construction specs!

NC-v4.1 MRc2: Environmental Product Declarations
posted by Joanna Switzer on Apr 17, 2020, 2:38 pm

will not be renewed.  Instead Interface has replaced that backing in their line-up with "CQuest GB" and I am told that they have been producing and shipping the CQuest GB for orders submitted with GlasBacRe...

Last reply: Lauren Richardson, Jan 29, 2024, 10:14 am

Cool Walls

NC-v4 INc1: Innovation
posted by Juan Carlos Valenzuela on Jan 25, 2024, 11:33 am

emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 475 thumbs up January 25, 2024- 1:18 pm Hi Juan, For the Heat Island Credit, there are standard values shared in the "LEEDuser's Viewpoint" landing page for concrete; these are not necessarily the same ones that should be assumed for vertical applications, though. I'm not entirely sure how those would be determined without testing. For me, that's what makes the Cool Walls option difficult- there just aren't a lot of products that have the contextual info available. Log...

Last reply: Juan Carlos Valenzuela , Jan 25, 2024, 2:39 pm

Using Existing LEED certified Parking for EV Charger Installation in New Project

NC-v4 LTc8: Green vehicles
posted by sompoche sirichote on Jan 16, 2024, 9:51 am

Emily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 369 thumbs up January 18, 2024- 4:05 pm It sounds like the parking area serves both buildings. I don't see any issue with using the lot to add chargers for Phase 2 and earn the credit. I recommend: Draw the LEED boundary to exclude all the parking, since it is already part of a certified project and not under construction...

Last reply: Emily Purcell, Jan 18, 2024, 4:05 pm

CO2e lb/mile per transport or per person

EBOM-v4.1 LTp1: Transportation Performance
posted by Jorge Lopez de Obeso on Jun 21, 2023, 11:55 am

for an employee to get to work at zero. It also encourages them to avoid using motor cycles which they would if it was not for the bus shuttle. Among the road transport options, doesn't bus travel have one...

Last reply: Yusuf Turab, Jan 18, 2024, 2:31 am

Project vs Lighting boundary

NC-v4 SSc6: Light Pollution Reduction
posted by Bill Swanson on May 17, 2017, 10:10 am

parking lot in the NE corner of the property that we are excluding from the LEED boundary. We aren't doing any work on it but would be replacing the existing perimeter lighting to match the new site...

Last reply: Kelli Kimura, Jan 12, 2024, 4:20 pm

View Type 1 with non-continuous window glazing

NC-v4 EQc8: Quality Views
posted by Edgar Arevalo on Jan 8, 2024, 4:53 pm

of the Views from each Regularly Occupied Space.  With both we considered the various lines of sight.  For example, the closer to the wall section between windows someone would hypothetically work or study,...

Last reply: Edgar Arevalo, Jan 11, 2024, 1:46 pm

"Weighted sum of non-roof and roof measures" Issue

NC-v4 SSc5: Heat Island Reduction
posted by Edgar Arevalo on Jan 10, 2024, 10:48 am

for 2 points."  But under the line item for "Weighted sum of non-roof and roof measures (sq.ft.)", there are two values, one from the total weighted area and one from the total standard area. If the form wanted us to use the weighted sum of non-roof and roof measures, why include both total weighted and total standard in the same line??? Is it to use whichever one is the most advantageous for us against...

Last reply: Edgar Arevalo, Jan 11, 2024, 12:43 pm